Chapter 8: Acceptance & Commissioning Procedures
Site Acceptance Procedure
phn-3962 004v000
Page 8-5
SITE ACCEPTANCE CHECKLIST
(continued)
7. FLEXIBLE WAVEGUIDE
Overall flexible WG length:
Flexible WG type:
Flexible WG is connected securely to ODU and
Antenna
OK
Flexible WG connector is weather-proofed (sealed)
at the ODU
OK
At the ODU, the flexible WG has a service/drip loop
to prevent moisture from entering the connector
OK
Flexible WG is secured using suitable restraints to
fixed points at regular intervals (0.5 m
recommended)
OK
Flexible WG has no sharp bends, kinks, or crushed
areas. All bends are per manufacturer
specifications
OK
Flexible WG point-of-entry to building/shelter is
weather-proof
OK
Flexible WG ends are properly labeled
OK
8. DC POWER SUPPLY - Two Inputs
Measured DC voltage input to the IDU:
(-40.5 to -60 VDC)
Power-Supply maximum current:
Power-Supply is properly grounded
OK
DC power backup type:
IDU DC connector is secure and the DC input leads
are correctly terminated (no bare wires are visible)
OK
IDU DC connector (+) and (GND) leads are shorted
and GND is grounded
OK
9. RACK INSTALLATION
Rack is mounted to the shelter floor with four
screws
OK
Rack is mounted to the shelter wall with two screws
OK
Содержание PTP 820C
Страница 1: ...INSTALLATION GUIDE PTP 820C and PTP 820C Assured System Release 10 0 ...
Страница 8: ...Contents phn 3962 004v000 Page vi Scope 8 9 Commissioning Test 8 9 PTP 820 Commissioning Log 8 11 ...
Страница 29: ...Chapter 2 Product Hardware Description MultiCore Mediation Devices MCMD phn 3962 004v000 Page 2 5 Figure 5 OMT ...
Страница 31: ...Chapter 2 Product Hardware Description PoE Injector phn 3962 004v000 Page 2 7 Figure 7 PoE Injector Ports ...
Страница 33: ...Chapter 2 Product Hardware Description System Components phn 3962 004v000 Page 2 9 ...
Страница 193: ...Chapter 6 Installation Procedures per Configuration Type AFR 1 0 Hub Site phn 3962 004v000 Page 6 92 ...