Chapter 8: Acceptance & Commissioning Procedures
Site Acceptance Procedure
phn-3962 004v000
Page 8-3
Site Acceptance Procedure
The purpose of the following procedures is to verify that all installation requirements were noted
and checked. Following this procedure will ensure proper, long-lasting, and safe operation of the
product.
The checklist below summarizes the installation requirements of the site.
SITE ACCEPTANCE CHECKLIST
1. SITE INFORMATION
Customer:
Radio model:
Site name:
Site code:
Radio link code:
Site address:
2. ANTENNA MOUNTING
Antenna mount type:
Mount is of sufficient height to clear local
obstructions
OK
Mount is safely positioned to not cause a safety
hazard
OK
Mount is secure and perpendicular
OK
Mount is grounded as per site specifications
OK
All steelwork is Galvanized or Stainless Steel as
appropriate
OK
3. ANTENNA
Antenna type (model and size):
Antenna is securely fixed to mount
OK
Antenna is grounded as per site specifications
OK
Antenna sway braces are installed correctly (where
applicable)
OK
Antenna Radome is securely fitted (where
applicable)
OK
Water drain plugs are fitted and removed, as
appropriate
OK
Содержание PTP 820C
Страница 1: ...INSTALLATION GUIDE PTP 820C and PTP 820C Assured System Release 10 0 ...
Страница 8: ...Contents phn 3962 004v000 Page vi Scope 8 9 Commissioning Test 8 9 PTP 820 Commissioning Log 8 11 ...
Страница 29: ...Chapter 2 Product Hardware Description MultiCore Mediation Devices MCMD phn 3962 004v000 Page 2 5 Figure 5 OMT ...
Страница 31: ...Chapter 2 Product Hardware Description PoE Injector phn 3962 004v000 Page 2 7 Figure 7 PoE Injector Ports ...
Страница 33: ...Chapter 2 Product Hardware Description System Components phn 3962 004v000 Page 2 9 ...
Страница 193: ...Chapter 6 Installation Procedures per Configuration Type AFR 1 0 Hub Site phn 3962 004v000 Page 6 92 ...