![Burnham 5006B Скачать руководство пользователя страница 94](http://html1.mh-extra.com/html/burnham/5006b/5006b_installation-and-operation-manual_2832904094.webp)
94
DIAPHRAGM V
AL
VE “LO-HI-LO” GAS
TRAIN
CANADA
- NA
TURAL
GAS ONL
Y
PAR
T NO.
ITEM
BOILER SIZE
5006B - 5008B
5009B - 5014B
5015B
5016B
5017B - 5026B
“Lo-Hi-Lo” Gas V
alve
81660149
1” Honeywell V8944B1019
1
---
1
1
---
81660150
1¼” Honeywell V8944B1027
---
1
---
1
1
Solenoid Gas V
alve
81660081
1” - ITT
Gen. K8A461
3
---
3
3
---
81660094
1¼” - ITT
Gen. K8A771
---
3
---
3
3
Nat. Gas Regulator - Std. Cad Plate Spring 3.0” x 6.0” WC
8226006
Maxitrol R
V-61 1” x 1”
3
---
3
3
---
8226012
Maxitrol R
V-81 1¼” x 1¼”
---
3
---
3
3
LP
Gas Regulator HO1 Blue Spring 5.5” to 12.0” WC
822601
1
Maxitrol R
V-61 1” x 1”
3
---
3
3
---
8226012
Maxitrol R
V-81 1¼” x 1¼”
---
3
---
3
3
Leak Limiter
822614
Maxitrol #12A04 (included w/ R
V-61)
4
---
4
4
---
8226010
Maxitrol #12A34 (included w/ R
V-81)
---
4
---
4
---
Manual V
alve
822615
ConBraCo 50-GB5-01A
1” x 1”
5
---
5
5
---
8226161
ConBraCo 50-GB6-01A
1¼” x 1¼”
---
5
---
5
5
Pilot V
alve
822645
1/8”MPT
x ¼” OD
Tube
6
6
6
6
6
Manual V
alve
822619
Newman-Milliken 200M - 1”
7
---
7
7
---
822620
Newman-Milliken 200M - 1¼”
---
7
---
7
7
Sec
Ti
ON V
i - R
eP
A
iR P
ARTS (continued)
Содержание 5006B
Страница 10: ...10 Fig 6 ARRANGEMENT OF SECTIONS AND CANOPY S SECTION III INSTALLATION INSTRUCTIONS continued...
Страница 22: ...22 Fig 22 SECURING OF CANOPY DRAFTHOOD SECTION III INSTALLATION INSTRUCTIONS continued...
Страница 23: ...23 Fig 23 CANOPY DRAFTHOOD MOUNTING DIAGRAM SECTION III INSTALLATION INSTRUCTIONS continued...
Страница 29: ...29 Fig 28 MOUNTING ELEVATIONS OF M M 150 AND A 67M FLOAT LWCO SECTION III INSTALLATION INSTRUCTIONS continued...
Страница 51: ...51 Fig 46 wiring diagram 5006B THRU 5014B SECTION BOILERS OP CONTROL SYSTEM SECTION IV OPERATION continued...
Страница 53: ...53 Fig 47 wiring diagram 5015B THRU 5026B SECION BOILERS OP CONTROL SYSTEM SECTION IV OPERATION continued...
Страница 55: ...55 Fig 48 wiring diagram 5006B THRU 5014B SECTion BOILERS EP CONTROL SYSTEM SECTION IV OPERATION continued...
Страница 56: ...56 Fig 49 wiring diagram 5015B THRU 5026B SECTION BOILERS EP CONTROL SYSTEM SECTION IV OPERATION continued...
Страница 68: ...68 Fig 58 PILOT LOCATIONS SECTION V SERVICE continued...
Страница 72: ...72 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 74: ...74 Fig 64 BASE PARTS 5006B Thru 5014B SECTION VI REPAIR PARTS continued...
Страница 76: ...76 Fig 65 BASE PARTS 5015B thru 5026B SECTION VI REPAIR PARTS continued...
Страница 78: ...78 Fig 66 INTEGRAL CANOPY DRAFTHOODS SECTIONS SECTION VI REPAIR PARTS continued...
Страница 82: ...82 Fig 67 JACKETS SECTION VI REPAIR PARTS continued...
Страница 102: ...102 Control assembly and mounting bracket OP EP CONTROL SYSTEMS SECTION VI REPAIR PARTS continued...
Страница 111: ...111 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 112: ...112...