![Burnham 5006B Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/burnham/5006b/5006b_installation-and-operation-manual_2832904002.webp)
2
BOILER SIZE
5006B 5007B 5008B 5009B 5010B 5011B 5012B 5013B 5014B 5015B 5016B 5017B 5018B 5019B 5020B 5021B 5022B 5024B 5026B
(1)
LEH
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
(1)
REH
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
(1)
C
4
5
6
7
8
8
9
10
11
12
13
14
15
16
16
17
18
19
21
(2)
CX
---
---
---
---
---
---
---
---
---
1
1
1
1
1
1
2
2
3
3
(3)
CXP
---
---
---
---
---
1
1
1
1
---
---
---
---
---
1
---
---
---
---
(1)
Section Marking Cast on Section
(2)
“C” Cast on Section - When supply and return connections are tapped, section is paint stencilled “CX”
(3)
“C” Cast on Section - When supply and return connections are tapped and plugged, section is paint stencilled “CXP”
CARTONS, PACKAGES, OR BUNDLES
1
Base-Burner-Manifold Assembly (By Gas and By Pilot System) - One Left & One Right Req’d on 5015B and Larger Boilers
COMPLETE
1
6
1
7
1
8
1
9
1
10
1
11
1
12
1
13
1
14
---
---
---
---
---
---
---
---
---
L. SUB-BASE
---
---
---
---
---
---
---
---
---
L
1S
15
L
1S
16
L
1S
17
L
1S
18
L
1S
19
L
1S
20
L
1S
21
L
1S
22
L
1S
24
L
1S
26
R. SUB-BASE
---
---
---
---
---
---
---
---
---
R
1S
8
R
1S
9
R
1S
9
R
1S
10
R
1S
10
R
1S
10
R
1S
10
R
1S
10
R
1S
13
R
1S
13
2
Tie Rod Bundle(s) 4 Sizes - One to Five Per Boiler
22”
---
---
1
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
27”
---
---
1
2
1
---
---
---
2
1
---
---
---
---
1
---
---
---
2
37”
1
---
---
---
1
2
1
---
1
2
3
2
1
---
3
4
3
1
---
42”
---
1
---
---
---
---
1
2
---
---
--
1
2
3
---
---
1
3
3
2 A
Draw-up Rod Bundle(s) 3 Sizes - One to Three Per Boiler
37¾”
---
---
---
---
---
2
2
1
1
---
---
---
---
---
---
---
---
---
---
49¼”
1
1
---
---
---
---
---
1
1
2
2
1
1
1
---
---
---
3
2
67¼”
---
---
1
1
1
---
---
---
---
---
---
1
1
1
2
2
2
---
1
3 A
Boiler Assembly Carton(s) 6 Sizes - One to Five Per Boiler
3A6
1
---
---
---
---
1
---
---
---
---
1
---
---
---
---
1
---
---
---
3A7
---
1
---
---
---
---
1
---
---
---
---
1
---
---
---
---
1
---
---
3A8
---
---
1
---
---
---
---
1
---
---
---
---
1
---
---
---
---
---
1
3A9
---
---
---
1
---
---
---
---
1
---
---
---
---
1
---
---
---
1
1
3A10
---
---
---
---
1
---
---
---
---
1
---
---
---
---
1
---
---
---
---
3AM
---
---
---
---
---
1
1
1
1
1
2
2
2
2
2
3
3
3
3
4
Boiler Sealing Carton(s) 5 Sizes - One to Three Per Boiler
06
1
---
---
---
---
2
1
---
---
---
---
---
---
---
2
---
1
---
---
07
---
1
---
---
---
---
1
2
1
---
---
---
---
---
---
2
---
---
---
08
---
---
1
---
---
---
---
---
1
2
1
---
---
---
---
---
---
1
---
09
---
---
---
1
---
---
---
---
---
---
1
2
1
---
---
---
2
2
2
10
---
---
---
---
1
---
---
---
---
---
---
---
1
2
1
1
---
---
1
5
Integral Drafhood Carton(s) 5 Sizes - One to Four Per Boiler (Natural & LP)
06
1
---
---
---
---
2
1
---
---
---
---
---
---
---
2
1
---
1
---
07
---
1
---
---
---
---
1
2
1
---
---
---
---
---
---
1
2
3
3
08
---
---
1
---
---
---
---
---
1
2
1
---
---
---
---
---
---
---
1
09
---
---
---
1
---
---
---
---
---
---
1
2
1
---
---
---
---
---
---
10
---
---
---
---
1
---
---
---
---
---
---
---
1
2
1
1
1
---
---
SecTiON i – eQUiPMeNT cHecK LiST
U.S.A. EQUIPMENT CHECK LIST
(For Canadian Equipment Check List, Turn to Pages 4 and 5)
This Equipment Check List has been provided so that the Installer can determine if all parts have been provided for the boiler ordered.
It covers standard equipment for both steam and water boilers without Tankless Heaters. Heaters or optional equipment ordered will be in
addition to, or in lieu of, equipment shown below.
By opening cartons in numerical sequence, boiler assembly is simplified. If there is an exception, it will be pointed out in the boiler
assembly procedure. When it does occur, you will find that assembly of the boiler is further simplified.
Содержание 5006B
Страница 10: ...10 Fig 6 ARRANGEMENT OF SECTIONS AND CANOPY S SECTION III INSTALLATION INSTRUCTIONS continued...
Страница 22: ...22 Fig 22 SECURING OF CANOPY DRAFTHOOD SECTION III INSTALLATION INSTRUCTIONS continued...
Страница 23: ...23 Fig 23 CANOPY DRAFTHOOD MOUNTING DIAGRAM SECTION III INSTALLATION INSTRUCTIONS continued...
Страница 29: ...29 Fig 28 MOUNTING ELEVATIONS OF M M 150 AND A 67M FLOAT LWCO SECTION III INSTALLATION INSTRUCTIONS continued...
Страница 51: ...51 Fig 46 wiring diagram 5006B THRU 5014B SECTION BOILERS OP CONTROL SYSTEM SECTION IV OPERATION continued...
Страница 53: ...53 Fig 47 wiring diagram 5015B THRU 5026B SECION BOILERS OP CONTROL SYSTEM SECTION IV OPERATION continued...
Страница 55: ...55 Fig 48 wiring diagram 5006B THRU 5014B SECTion BOILERS EP CONTROL SYSTEM SECTION IV OPERATION continued...
Страница 56: ...56 Fig 49 wiring diagram 5015B THRU 5026B SECTION BOILERS EP CONTROL SYSTEM SECTION IV OPERATION continued...
Страница 68: ...68 Fig 58 PILOT LOCATIONS SECTION V SERVICE continued...
Страница 72: ...72 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 74: ...74 Fig 64 BASE PARTS 5006B Thru 5014B SECTION VI REPAIR PARTS continued...
Страница 76: ...76 Fig 65 BASE PARTS 5015B thru 5026B SECTION VI REPAIR PARTS continued...
Страница 78: ...78 Fig 66 INTEGRAL CANOPY DRAFTHOODS SECTIONS SECTION VI REPAIR PARTS continued...
Страница 82: ...82 Fig 67 JACKETS SECTION VI REPAIR PARTS continued...
Страница 102: ...102 Control assembly and mounting bracket OP EP CONTROL SYSTEMS SECTION VI REPAIR PARTS continued...
Страница 111: ...111 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 112: ...112...