![Burnham 5006B Скачать руководство пользователя страница 103](http://html1.mh-extra.com/html/burnham/5006b/5006b_installation-and-operation-manual_2832904103.webp)
103
EI CONTROL SYSTEM - HONEYWELL Q3481 PILOT ASSEMBLY
EI CONTROL SYSTEM - PILOT ASSEMBLY
6236072 EI - 1, NAT., 5006B - 6009B Sections
6236075 EI - 2, NAT., 5010B - 5026B Sections
6236076 EI - 2, NAT., 5010B - 5026B Sections
Not Available ........LP, 5010B - 5026B Sections
PART NO.
ITEM
100331-01
(1) Pilot Burner/Igniter/Sensor Honeywell Q3481B1172, Nat. Gas with NE22 orifice
100332-01
(1) Pilot Burner/Igniter/Sensor Honeywell Q3481B1180, LP Gas with KR14 orifice
6136054
(2) Pilot Ground Wire Assembly, 36” (5006B - 5009B)
6137375
(2) Pilot Ground Wire Assembly, 72” (5010B - 5026B)
8236015
(3) Vent Tube Tip (USA Only) (5010B - 5026B Sections Only)
8236016
(4) Vent Tube Clip - Tinnerman C4886A4-27 (USA Only) (5010B - 5026B Sections Only)
8236048
(5) Vent Tube - ¼” x 18” Long Aluminum Tubing
For Canada, Omit Vent Tube, Vent Tube Tip and Vent Tube Clips. These items are not
used on 5006B - 5009B Sections, Robertshaw Gas Valves - USA.
SecTiON Vi - RePAiR PARTS (continued)
Содержание 5006B
Страница 10: ...10 Fig 6 ARRANGEMENT OF SECTIONS AND CANOPY S SECTION III INSTALLATION INSTRUCTIONS continued...
Страница 22: ...22 Fig 22 SECURING OF CANOPY DRAFTHOOD SECTION III INSTALLATION INSTRUCTIONS continued...
Страница 23: ...23 Fig 23 CANOPY DRAFTHOOD MOUNTING DIAGRAM SECTION III INSTALLATION INSTRUCTIONS continued...
Страница 29: ...29 Fig 28 MOUNTING ELEVATIONS OF M M 150 AND A 67M FLOAT LWCO SECTION III INSTALLATION INSTRUCTIONS continued...
Страница 51: ...51 Fig 46 wiring diagram 5006B THRU 5014B SECTION BOILERS OP CONTROL SYSTEM SECTION IV OPERATION continued...
Страница 53: ...53 Fig 47 wiring diagram 5015B THRU 5026B SECION BOILERS OP CONTROL SYSTEM SECTION IV OPERATION continued...
Страница 55: ...55 Fig 48 wiring diagram 5006B THRU 5014B SECTion BOILERS EP CONTROL SYSTEM SECTION IV OPERATION continued...
Страница 56: ...56 Fig 49 wiring diagram 5015B THRU 5026B SECTION BOILERS EP CONTROL SYSTEM SECTION IV OPERATION continued...
Страница 68: ...68 Fig 58 PILOT LOCATIONS SECTION V SERVICE continued...
Страница 72: ...72 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 74: ...74 Fig 64 BASE PARTS 5006B Thru 5014B SECTION VI REPAIR PARTS continued...
Страница 76: ...76 Fig 65 BASE PARTS 5015B thru 5026B SECTION VI REPAIR PARTS continued...
Страница 78: ...78 Fig 66 INTEGRAL CANOPY DRAFTHOODS SECTIONS SECTION VI REPAIR PARTS continued...
Страница 82: ...82 Fig 67 JACKETS SECTION VI REPAIR PARTS continued...
Страница 102: ...102 Control assembly and mounting bracket OP EP CONTROL SYSTEMS SECTION VI REPAIR PARTS continued...
Страница 111: ...111 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 112: ...112...