35
2.
INSTALLATION OF BLEED PIPING – Using ¼” OD
aluminum tubing, install a bleed line on both diaphragm
valves, connect together, see Fig. 27 or 29 and run
FIG. 34
INSTALLATION OF PILOT SAFETY SWITCH
OP CONTROL SYSTEM
FIG. 35
PILOT PIPING
OP CONTROL SYSTEM
SecTiON iii – iNSTALLATiON iNSTRUcTiONS (continued)
tubing to bleed line protruding from inside base, see
Fig. 35. On boiler installed in Canada, run bleed line to
outdoors.
3.
INSTALLATION OF “OP” PANEL AND WIRING
OF PILOT AND PILOTSTAT – Attach the OP Control
Panel with RM7890 control, see Fig. 36, to the front
top jacket panel, preferably on the closest jacket panel
to the gas train installed. There are (3) three KO’s and
(4) four fastener holes provided for this purpose, use (4)
four #8 SMS to fasten the Control Panel to the front top
jacket panel.
Connect the two wires from the Q179D pilot to the
RM7890 sub-base as follows:
a. Ground Wire (200ºC) to the “12” terminal
b. Flame detector wire (Honeywell 1298020) to “11”
terminal
c. Thermocouple Lead to L62 Pilotstat.
Wire the pilotstat to the gas valve transformer and to the
V88A Gas Valves using the 105ºC wire furnished, see
Fig. 46 or 47. If Foot Mounted transformer, connect to
J-box using straight connector, BX, straight connector
and ½” pipe coupling. Drill holes in Jacket and fasten
Transformer with SMS.
Содержание 5006B
Страница 10: ...10 Fig 6 ARRANGEMENT OF SECTIONS AND CANOPY S SECTION III INSTALLATION INSTRUCTIONS continued...
Страница 22: ...22 Fig 22 SECURING OF CANOPY DRAFTHOOD SECTION III INSTALLATION INSTRUCTIONS continued...
Страница 23: ...23 Fig 23 CANOPY DRAFTHOOD MOUNTING DIAGRAM SECTION III INSTALLATION INSTRUCTIONS continued...
Страница 29: ...29 Fig 28 MOUNTING ELEVATIONS OF M M 150 AND A 67M FLOAT LWCO SECTION III INSTALLATION INSTRUCTIONS continued...
Страница 51: ...51 Fig 46 wiring diagram 5006B THRU 5014B SECTION BOILERS OP CONTROL SYSTEM SECTION IV OPERATION continued...
Страница 53: ...53 Fig 47 wiring diagram 5015B THRU 5026B SECION BOILERS OP CONTROL SYSTEM SECTION IV OPERATION continued...
Страница 55: ...55 Fig 48 wiring diagram 5006B THRU 5014B SECTion BOILERS EP CONTROL SYSTEM SECTION IV OPERATION continued...
Страница 56: ...56 Fig 49 wiring diagram 5015B THRU 5026B SECTION BOILERS EP CONTROL SYSTEM SECTION IV OPERATION continued...
Страница 68: ...68 Fig 58 PILOT LOCATIONS SECTION V SERVICE continued...
Страница 72: ...72 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 74: ...74 Fig 64 BASE PARTS 5006B Thru 5014B SECTION VI REPAIR PARTS continued...
Страница 76: ...76 Fig 65 BASE PARTS 5015B thru 5026B SECTION VI REPAIR PARTS continued...
Страница 78: ...78 Fig 66 INTEGRAL CANOPY DRAFTHOODS SECTIONS SECTION VI REPAIR PARTS continued...
Страница 82: ...82 Fig 67 JACKETS SECTION VI REPAIR PARTS continued...
Страница 102: ...102 Control assembly and mounting bracket OP EP CONTROL SYSTEMS SECTION VI REPAIR PARTS continued...
Страница 111: ...111 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 112: ...112...