![Burnham 5006B Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/burnham/5006b/5006b_installation-and-operation-manual_2832904011.webp)
11
c. Insert short end of draw-up rod through front & rear
nipple ports on both sections, see Fig. 5.
d. Place two (2) flat washers, draw-up channel and a
nut on each end of draw-up rods and finger tighten.
e. DRAW UP CENTER SECTION SLOWLY AND
EVENLY, tightening each DRAW-UP ROD a little
at a time so that sections are equally spaced. KEEP
NIPPLES ALIGNED WITH NIPPLE PORTS. If
necessary, tap Nipples lightly with a blunt tool or
rod to keep Nipples from cocking while Sections are
being drawn up. DO NOT DRAW UP SECTION(S)
WHEN NIPPLES ARE COCKED. Continue
tightening Draw-Up Rods equally until Sections
meet iron-to-iron on the ground surface. BUMPING
OUTER EDGES OF SECTION WITH WOODEN
BLOCK WILL EASE DRAW-UP OPERATION.
f. KEEP DRAW-UP ROD THREADS, NUTS AND
WASHERS LUBRICATED with grease or heavy oil
to prevent damage to rods and threads and to make
assembling easier.
g. USING A PINCH BAR, insert WOOD WEDGES
under last Center Section assembled so as to raise
it just above Boiler Base. This will keep the next
section to be assembled above the base, thus making
it easier to join and draw-up. MOVE WOOD
WEDGES FORWARD EACH time a Section has
been drawn up.
7.
ASSEMBLE REMAINING END SECTION WITH
DRAW-UP RODS in a manner similar to that for
assembling Center Sections. Remove wedges from
under Boiler. Be sure Boiler is aligned and seated on
Base.
a. After section assembly is completed install 5/8” tie
rods from tie rod bundle through the upper lug holes
in the front of Boiler and Lower lug holes in the rear
of Boiler sections and tighten until they are finger
tight only, to allow for expansion. This is necessary
in order to allow clearance for installation of Flue
cover plates. Finally, remove ¾” draw-up rods from
nipple ports.
FIG. 7
PURPOSE OF TAPPINGS AND THEIR LOCATIONS
PURPOSE OF TAPPINGS
1
Location
Tapping Per
End Section
Size
Steam Boilers
Water Boilers
A
1
3”
Supply
Supply
B
1
3”
Return
Return
C
2
1
1-1/2”
Pressure Operating Control
(Bushed to 1/4”)
Temperature Operating Control (less heater)
Bushed to 3/4”; Plug (with heater)
D
1
1/2”
Pressure Gauge
Theraltimeter
E
2
1/2”
Water Gauge, LWCO & Pressure Limit
Plug
F
1
3/8”
Try-Cock (Special Order)
----
G
3
1
----
Cover Plate
Cover Plate or Tankless Heater
H
1
1”
See Note 4
See Note 4
J
1
1-1/2”
Indirect Water Heater
Supply or Return
----
K
1
3/4”
Indirect Water Heater Limit
----
1
Tappings on both end sections are identical - Recommend trim be installed in left end section or on same end as gas train.
2
This tapping is used for safety valve and surface blowoff (steam boilers) and safety relief valve (water boilers) on end not equipped with trim.
3
Temperature operating control location on tankless heater equipped boilers. Also alternate operating control location, tapped cover plate.
4
If using a float type LWCO, feeder or pump controller on a steam boiler that does not use quick connect hook up fittings, install between
tappings H and return B. Use opposite return B for system return connection. Water boilers using a probe LWCO must mount probe in
supply pipe above boiler without any stop valves.
SecTiON iii – iNSTALLATiON iNSTRUcTiONS (continued)
Содержание 5006B
Страница 10: ...10 Fig 6 ARRANGEMENT OF SECTIONS AND CANOPY S SECTION III INSTALLATION INSTRUCTIONS continued...
Страница 22: ...22 Fig 22 SECURING OF CANOPY DRAFTHOOD SECTION III INSTALLATION INSTRUCTIONS continued...
Страница 23: ...23 Fig 23 CANOPY DRAFTHOOD MOUNTING DIAGRAM SECTION III INSTALLATION INSTRUCTIONS continued...
Страница 29: ...29 Fig 28 MOUNTING ELEVATIONS OF M M 150 AND A 67M FLOAT LWCO SECTION III INSTALLATION INSTRUCTIONS continued...
Страница 51: ...51 Fig 46 wiring diagram 5006B THRU 5014B SECTION BOILERS OP CONTROL SYSTEM SECTION IV OPERATION continued...
Страница 53: ...53 Fig 47 wiring diagram 5015B THRU 5026B SECION BOILERS OP CONTROL SYSTEM SECTION IV OPERATION continued...
Страница 55: ...55 Fig 48 wiring diagram 5006B THRU 5014B SECTion BOILERS EP CONTROL SYSTEM SECTION IV OPERATION continued...
Страница 56: ...56 Fig 49 wiring diagram 5015B THRU 5026B SECTION BOILERS EP CONTROL SYSTEM SECTION IV OPERATION continued...
Страница 68: ...68 Fig 58 PILOT LOCATIONS SECTION V SERVICE continued...
Страница 72: ...72 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 74: ...74 Fig 64 BASE PARTS 5006B Thru 5014B SECTION VI REPAIR PARTS continued...
Страница 76: ...76 Fig 65 BASE PARTS 5015B thru 5026B SECTION VI REPAIR PARTS continued...
Страница 78: ...78 Fig 66 INTEGRAL CANOPY DRAFTHOODS SECTIONS SECTION VI REPAIR PARTS continued...
Страница 82: ...82 Fig 67 JACKETS SECTION VI REPAIR PARTS continued...
Страница 102: ...102 Control assembly and mounting bracket OP EP CONTROL SYSTEMS SECTION VI REPAIR PARTS continued...
Страница 111: ...111 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 112: ...112...