![Burnham 5006B Скачать руководство пользователя страница 108](http://html1.mh-extra.com/html/burnham/5006b/5006b_installation-and-operation-manual_2832904108.webp)
108
Figure
Number
Page
Number
Description
Section Vi -
repair Parts
(continued)
Honeywell Ignition
Module
96
Ignition Module #S8610M and Support Bracket EI Control System
Johnson PSS
97
Pilotstat #L62GB and Support Bracket OP Thermocouple Control System
Penn Pilot Solenoid
Valve Ass’y
98
Transformer, Penn #H91WG-5 Pilot Solenoid Valve and Pilot Line Regulator EI Control System,
USA (5010B - 5026B) Natural Gas;
Canada (5006B - 5026B) Natural Gas
Maxitrol Pilot Reg
Ass’y
99
Transformer and Pilot Line Regulator, OP Control System
Maxitrol Pilot Reg
Ass’y
100
Transformer and Pilot Line Regulator, Thermocouple Control System (Canada)
Penn Pilot Solenoid
Valve Ass’y
101
Transformer, Penn #H91WA-4 Pilot Solenoid Valve and Pilot Line Regulator, EP Control System
OP/EP Control
Ass’y
102
Control Assembly and Mounting Bracket, OP / EP Control Systems
Honeywell Q3481
Pilot Ass’y
103
EI Control System - Honeywell Q3481 Pilot Assembly
Honeywell Q179D
Pilot Ass’y
104
OP Control System - Pilot Assembly
Honeywell Q179C
Pilot Ass’y
105
EP Control System - Pilot Assembly
Miscellaneous
Figures
106 - 108 Appendix A - Figures
APPeNDiX A - FiGUReS (continued)
Содержание 5006B
Страница 10: ...10 Fig 6 ARRANGEMENT OF SECTIONS AND CANOPY S SECTION III INSTALLATION INSTRUCTIONS continued...
Страница 22: ...22 Fig 22 SECURING OF CANOPY DRAFTHOOD SECTION III INSTALLATION INSTRUCTIONS continued...
Страница 23: ...23 Fig 23 CANOPY DRAFTHOOD MOUNTING DIAGRAM SECTION III INSTALLATION INSTRUCTIONS continued...
Страница 29: ...29 Fig 28 MOUNTING ELEVATIONS OF M M 150 AND A 67M FLOAT LWCO SECTION III INSTALLATION INSTRUCTIONS continued...
Страница 51: ...51 Fig 46 wiring diagram 5006B THRU 5014B SECTION BOILERS OP CONTROL SYSTEM SECTION IV OPERATION continued...
Страница 53: ...53 Fig 47 wiring diagram 5015B THRU 5026B SECION BOILERS OP CONTROL SYSTEM SECTION IV OPERATION continued...
Страница 55: ...55 Fig 48 wiring diagram 5006B THRU 5014B SECTion BOILERS EP CONTROL SYSTEM SECTION IV OPERATION continued...
Страница 56: ...56 Fig 49 wiring diagram 5015B THRU 5026B SECTION BOILERS EP CONTROL SYSTEM SECTION IV OPERATION continued...
Страница 68: ...68 Fig 58 PILOT LOCATIONS SECTION V SERVICE continued...
Страница 72: ...72 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 74: ...74 Fig 64 BASE PARTS 5006B Thru 5014B SECTION VI REPAIR PARTS continued...
Страница 76: ...76 Fig 65 BASE PARTS 5015B thru 5026B SECTION VI REPAIR PARTS continued...
Страница 78: ...78 Fig 66 INTEGRAL CANOPY DRAFTHOODS SECTIONS SECTION VI REPAIR PARTS continued...
Страница 82: ...82 Fig 67 JACKETS SECTION VI REPAIR PARTS continued...
Страница 102: ...102 Control assembly and mounting bracket OP EP CONTROL SYSTEMS SECTION VI REPAIR PARTS continued...
Страница 111: ...111 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 112: ...112...