![Burnham 5006B Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/burnham/5006b/5006b_installation-and-operation-manual_2832904005.webp)
5
BOILER SIZE
5006B
5007B
5008B
5009B
5010B
5011B
5012B
5013B
5014B
5015B
5016B
5017B
5018B
5019B
5020B
5021B
5022B
5024B
5026B
CARTONS, PACKAGES OR BUNDLES
7 S
Steam Trim Carton (Steam Boilers Only - Includes PA404 Pressure Limit Control) 4 Sizes - One Per Boiler
1
1
1
1
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
2
---
---
---
1
1
1
---
---
---
---
---
---
---
---
---
---
---
---
---
3
---
---
---
---
---
---
1
1
1
1
1
1
1
1
1
---
---
---
---
4
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
1
1
1
1
67 Bc-2
Low Water Cut-off Carton (Steam Boilers Only) One Per Boiler
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
7 W
Water Trim Carton (Water Boilers Only - Includes L4006A Temp. Limit Control) 3 Sizes - One Per Boiler
2
1
1
1
1
1
1
---
---
---
---
---
---
---
---
---
---
---
---
---
3
---
---
---
---
---
--
1
1
1
1
1
1
1
1
1
1
1
1
1
4
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
1
1
64
Low Water Cut-off Carton (Water Boilers Only) One Per Boiler
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
U
8
Complete Jacket Carton Assembly - One Per Boiler
c
9
1
Gas Train Cartons (By Gas) 2 Sizes - One or Two Per Boiler
c
9
1
1
1
1
---
---
---
---
---
---
2
1
---
---
---
---
---
---
---
---
c
9
2
---
---
---
1
1
1
1
1
1
---
1
2
2
2
2
2
2
2
2
THeRM.
Controls Carton(s) (Manual Ignition. - 100% Shutoff - 24V.) 1 Size - One or Two Per Boiler
Natural
1
1
1
1
1
1
1
1
---
2
2
2
2
2
2
2
2
2
---
OP
Controls Carton(s) (By Gas) (Manual Ign. - 100% Shutoff - 24V. - Nat. - 120V. LP) 1 Size - One or Two Per Boiler
Natural
---
---
---
---
---
---
---
---
1
---
---
---
---
---
---
---
---
--
2
Propane
1
1
1
1
1
1
1
1
1
2
2
2
2
2
2
2
2
2
2
U
HcP
1
Plain Heater Cover Plate (Not furnished on Water Boiler Ordered With Two Tankless Heaters) One Per Boiler
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
U
HcP
2
Tapped (¾” NPT) Heater Cover Plate (Not Furnished on Water Boiler Ordered With Tankless Heater(s) One Per Boiler
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
CANADIAN
EQUIPMENT CHECK LIST
INSPECT SHIPMENT carefully for any signs of damage. All equipment is carefully manufactured, inspected and packed.
Our responsibility ceases upon delivery of Boiler to carrier in good condition. Any claims for damage or shortage in
shipment must be filed immediately against the carrier by the consignee. No claims for variances or shortages will be
allowed by Boiler Manufacturer, unless presented within sixty (60) days after receipt of equipment.
SECTION I - EQUIPMENT CHECK LIST - Page 2
SECTION II - GENERAL INFORMATION - Page 7
SECTION III - INSTALLATION INSTRUCTIONS - Page 8
SECTION IV - OPERATION - Page 41
SECTION V - SERVICE - Page 65
SERVICE RECORDS - Page 72
SECTION VI - REPAIR PARTS - Page 73
APPENDIX A - FIGURES - Page 105
APPENDIX B - TABLES - Page 108
SecTiON i – eQUiPMeNT cHecK LiST (continued)
Содержание 5006B
Страница 10: ...10 Fig 6 ARRANGEMENT OF SECTIONS AND CANOPY S SECTION III INSTALLATION INSTRUCTIONS continued...
Страница 22: ...22 Fig 22 SECURING OF CANOPY DRAFTHOOD SECTION III INSTALLATION INSTRUCTIONS continued...
Страница 23: ...23 Fig 23 CANOPY DRAFTHOOD MOUNTING DIAGRAM SECTION III INSTALLATION INSTRUCTIONS continued...
Страница 29: ...29 Fig 28 MOUNTING ELEVATIONS OF M M 150 AND A 67M FLOAT LWCO SECTION III INSTALLATION INSTRUCTIONS continued...
Страница 51: ...51 Fig 46 wiring diagram 5006B THRU 5014B SECTION BOILERS OP CONTROL SYSTEM SECTION IV OPERATION continued...
Страница 53: ...53 Fig 47 wiring diagram 5015B THRU 5026B SECION BOILERS OP CONTROL SYSTEM SECTION IV OPERATION continued...
Страница 55: ...55 Fig 48 wiring diagram 5006B THRU 5014B SECTion BOILERS EP CONTROL SYSTEM SECTION IV OPERATION continued...
Страница 56: ...56 Fig 49 wiring diagram 5015B THRU 5026B SECTION BOILERS EP CONTROL SYSTEM SECTION IV OPERATION continued...
Страница 68: ...68 Fig 58 PILOT LOCATIONS SECTION V SERVICE continued...
Страница 72: ...72 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 74: ...74 Fig 64 BASE PARTS 5006B Thru 5014B SECTION VI REPAIR PARTS continued...
Страница 76: ...76 Fig 65 BASE PARTS 5015B thru 5026B SECTION VI REPAIR PARTS continued...
Страница 78: ...78 Fig 66 INTEGRAL CANOPY DRAFTHOODS SECTIONS SECTION VI REPAIR PARTS continued...
Страница 82: ...82 Fig 67 JACKETS SECTION VI REPAIR PARTS continued...
Страница 102: ...102 Control assembly and mounting bracket OP EP CONTROL SYSTEMS SECTION VI REPAIR PARTS continued...
Страница 111: ...111 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 112: ...112...