![Burnham 5006B Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/burnham/5006b/5006b_installation-and-operation-manual_2832904020.webp)
20
FIG. 19
INSTALLATION OF JACKET END PANELS
FIG. 20
VESTIBULE ATTACHMENT DIAGRAM
Attach Hex Couplings to end of
Carriage Bolts which secure flue
cover plates.
NOTE:
Select Carriage Bolts which
line up with holes in the Vestibule
Panel.
18.
SECURE VESTIBULE PANEL TO
HEX COUPLINGS
using ¼”-20 x
3/8” slotted pan head machine screws.
19
. ATTACH REAR TOP JACKET
PANEL TO UPPER END PANELS
using #8 SMS. Refer to Fig. 21.
20
. INSTALLATION OF CANOPY-
DRAFTHOOD
5006B thru 5010B
Section Boilers, see Fig. 22. Place
Cerafelt strips on top of section
assembly next to ledges formed by
center sections and next to ledge on
end sections. Overlap at corners.
21.
SECURE CANOPY-DRAFTHOOD
with 5/16”-18 x 5/8” MS driven into
the tapped lugs provided for this
purpose on top of the sections. Two
screws are required at each end.
Refer to Fig. 23.
SecTiON iii – iNSTALLATiON iNSTRUcTiONS (continued)
Содержание 5006B
Страница 10: ...10 Fig 6 ARRANGEMENT OF SECTIONS AND CANOPY S SECTION III INSTALLATION INSTRUCTIONS continued...
Страница 22: ...22 Fig 22 SECURING OF CANOPY DRAFTHOOD SECTION III INSTALLATION INSTRUCTIONS continued...
Страница 23: ...23 Fig 23 CANOPY DRAFTHOOD MOUNTING DIAGRAM SECTION III INSTALLATION INSTRUCTIONS continued...
Страница 29: ...29 Fig 28 MOUNTING ELEVATIONS OF M M 150 AND A 67M FLOAT LWCO SECTION III INSTALLATION INSTRUCTIONS continued...
Страница 51: ...51 Fig 46 wiring diagram 5006B THRU 5014B SECTION BOILERS OP CONTROL SYSTEM SECTION IV OPERATION continued...
Страница 53: ...53 Fig 47 wiring diagram 5015B THRU 5026B SECION BOILERS OP CONTROL SYSTEM SECTION IV OPERATION continued...
Страница 55: ...55 Fig 48 wiring diagram 5006B THRU 5014B SECTion BOILERS EP CONTROL SYSTEM SECTION IV OPERATION continued...
Страница 56: ...56 Fig 49 wiring diagram 5015B THRU 5026B SECTION BOILERS EP CONTROL SYSTEM SECTION IV OPERATION continued...
Страница 68: ...68 Fig 58 PILOT LOCATIONS SECTION V SERVICE continued...
Страница 72: ...72 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 74: ...74 Fig 64 BASE PARTS 5006B Thru 5014B SECTION VI REPAIR PARTS continued...
Страница 76: ...76 Fig 65 BASE PARTS 5015B thru 5026B SECTION VI REPAIR PARTS continued...
Страница 78: ...78 Fig 66 INTEGRAL CANOPY DRAFTHOODS SECTIONS SECTION VI REPAIR PARTS continued...
Страница 82: ...82 Fig 67 JACKETS SECTION VI REPAIR PARTS continued...
Страница 102: ...102 Control assembly and mounting bracket OP EP CONTROL SYSTEMS SECTION VI REPAIR PARTS continued...
Страница 111: ...111 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 112: ...112...