![Burnham 5006B Скачать руководство пользователя страница 32](http://html1.mh-extra.com/html/burnham/5006b/5006b_installation-and-operation-manual_2832904032.webp)
32
38.
THE INSTALLATION OF THE REMAINDER OF THE GAS CONTROLS IS DEPENDENT ON THE CONTROL
SYSTEM FURNISHED.
REFER TO THE TABLE BELOW FOR THE FIGURES IN THIS MANUAL APPLICABLE
TO THE VARIOUS CONTROL SYSTEMS OFFERED AS STANDARD OR AS OPTIONAL EQUIPMENT. IF THE
CONTROL SYSTEM ORDERED IS NOT LISTED, SPECIAL INSTRUCTIONS HAVE BEEN PREPARED BY THE
APPLICATION ENGINEERING DEPARTMENT AND CAN BE FOUND IN THE INSTRUCTION ENVELOPE
FURNISHED WITH THE BOILER.
BOILER SIZE
CONTROL SYS-
TEM
NATURAL GAS
LP
REFERENCE
FIGURES
USA
CANADA
USA
CANADA
STD
OPT
STD
OPT
STD
OPT
STD
OPT
6 thru 9 sect.
EI
X
---
---
X
X
---
---
---
28, 29
10 thru 26 sect.
EI
X
---
---
X
---
---
---
---
28, 30
6 thru 26 sect.
EI
---
X
---
---
---
---
28, 30
6 thru 9 sect.
OP
---
X
---
X
---
X
X
---
31, 32, 33
10 thru 13 sect.
OP
---
X
---
X
X
---
X
---
31, 32, 33
14 sect.
OP
---
X
X
---
X
---
X
---
31, 32, 33
15 thru 24 sect.
OP
---
X
---
X
X
---
X
---
31, 32, 33
26 sect.
OP
---
X
X
---
X
---
X
---
31, 32, 33
6 thru 14 sect.
EP
---
X
---
X
---
---
---
---
33, 34
15 thru 26 sect.
EP
---
X
---
X
---
---
---
---
33, 34
6 thru 13 sect.
Thermocouple
---
---
X
---
---
---
---
---
38
15 thru 24 sect.
Thermocouple
---
---
X
---
---
---
---
---
39
Open Gas Controls Carton(s)
NOTE: On those boilers with two manifolds (15 sect. and larger), two identical sets of Gas Controls are furnished. Hence,
the procedure for installing one set is equally applicable to the second set.
ground joint union, as show in Fig. 1, should be
installed in the piping to each gas train for ease of
servicing.
CONNECT GAS SERVICE FROM METER TO GAS
TRAIN in accordance with the requirements of the
authority having jurisdiction or, in the absence of such
requirements to the –
USA – “National Fuel Gas Code, ANSI Z223.1”.
CANADA – “Installation Codes for Natural and LP Gas
Burning Appliances and Equipment, CAN/B149.1 &
.2”.
The size of the gas train(s) has no criteria as to the size
of the service from the meter to the gas train(s). Sizing
of the service is dependent on:
a. Required supply of gas in cu. ft./hr.
input of boiler in BTUH
= heat value of gas,
BTU/cu. ft.
b. Allowable loss of pressure in piping to obtain
minimum input pressure indicated on rating label of
boiler.
c. Length of piping in feet and number of elbows – for
practical purposes each 90º elbow can be considered
as the following equivalent in length of straight
pipe:
3/4”
-
2.1 ft.
2” - 5.2 ft.
1”
-
2.6 ft.
2-1/2” - 6.2 ft.
1-1/4”
-
3.5 ft.
3” - 7.7 ft.
1-1/2”
-
4.0 ft.
4” - 10.1 ft.
d. Specific gravity of gas
In the absence of requirements of the authority
having jurisdiction, the tables below may be used to
size natural gas supply piping.
A pipe thread compound resistant to the action
of liquefied petroleum gases must be used on all
threaded joints in the gas piping.
Pressure testing of the Gas Supply Piping Boiler and
its connections is required before placing the boiler
in operation.
The boiler and shutoff valve must be disconnected
from the gas supply piping system during any
pressure testing at pressures greater than ½” psig.
The boiler must be isolated from the gas supply
piping system during any pressure testing at
pressures equal to or less than ½ psig.
SecTiON iii – iNSTALLATiON iNSTRUcTiONS (continued)
Содержание 5006B
Страница 10: ...10 Fig 6 ARRANGEMENT OF SECTIONS AND CANOPY S SECTION III INSTALLATION INSTRUCTIONS continued...
Страница 22: ...22 Fig 22 SECURING OF CANOPY DRAFTHOOD SECTION III INSTALLATION INSTRUCTIONS continued...
Страница 23: ...23 Fig 23 CANOPY DRAFTHOOD MOUNTING DIAGRAM SECTION III INSTALLATION INSTRUCTIONS continued...
Страница 29: ...29 Fig 28 MOUNTING ELEVATIONS OF M M 150 AND A 67M FLOAT LWCO SECTION III INSTALLATION INSTRUCTIONS continued...
Страница 51: ...51 Fig 46 wiring diagram 5006B THRU 5014B SECTION BOILERS OP CONTROL SYSTEM SECTION IV OPERATION continued...
Страница 53: ...53 Fig 47 wiring diagram 5015B THRU 5026B SECION BOILERS OP CONTROL SYSTEM SECTION IV OPERATION continued...
Страница 55: ...55 Fig 48 wiring diagram 5006B THRU 5014B SECTion BOILERS EP CONTROL SYSTEM SECTION IV OPERATION continued...
Страница 56: ...56 Fig 49 wiring diagram 5015B THRU 5026B SECTION BOILERS EP CONTROL SYSTEM SECTION IV OPERATION continued...
Страница 68: ...68 Fig 58 PILOT LOCATIONS SECTION V SERVICE continued...
Страница 72: ...72 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 74: ...74 Fig 64 BASE PARTS 5006B Thru 5014B SECTION VI REPAIR PARTS continued...
Страница 76: ...76 Fig 65 BASE PARTS 5015B thru 5026B SECTION VI REPAIR PARTS continued...
Страница 78: ...78 Fig 66 INTEGRAL CANOPY DRAFTHOODS SECTIONS SECTION VI REPAIR PARTS continued...
Страница 82: ...82 Fig 67 JACKETS SECTION VI REPAIR PARTS continued...
Страница 102: ...102 Control assembly and mounting bracket OP EP CONTROL SYSTEMS SECTION VI REPAIR PARTS continued...
Страница 111: ...111 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 112: ...112...