BÜCHI Labortechnik AG
Installation | 5
Operation Manual ProxiMate™
21/94
5
Installation
5.1
Before installation
NOTICE
Instrument damage due to switching it on too early.
Switching on the instrument too early after transportation can cause damage.
u
Climatize the instrument after transportation.
5.2
Installation site
The installation site must meet the following requirements:
Firm, level and vibration-free surface.
Minimum space requirement: 260 mm x 435 mm x 500 mm (W x D x H).
Take into account the maximum product dimensions and weight.
Do not expose the instrument to any external thermal loads, such as direct solar
radiation.
NOTE
Make sure that the power supply can be disconnected at any time in an emergency.
5.3
Securing against earthquakes
1
2
Fig. 9: Securing against earthquakes
1
Cooler
2
Cord
u
Loop a cord around the cooler and attach it to a fixed point.
Содержание ProxiMate
Страница 1: ...ProxiMate Operation Manual 11593981 D en...