
6. Replacing Parts
6-2-12. Control Box Assy
Adjust the firmware with GT-3 Service Tool, after you replace to the new Control Box. (Refer to “3-3. GT-3
Service Tool”.) Refer to the page “How to connect/disconnect the FFC Connector” in “6-2-18. Replacing the
Carriage PCB Assy” when you handle FFC Connectors.
Required Tools
Thermistor
Disassembling
1.
Remove the AC Cord and remove the Cover DR (right side), Cover PB and Cover DB. (Refer to “6-1-2.
Assembling/Disassembling of the Covers”.)
2.
Remove the Power Cover. (Refer to “6-2-10. Power Unit”.)
3.
Remove the one Connector (1) and the two Faston Terminals (2).
(1)
(2)
4.
Remove the two screws (3) that connect the Ground Wire (green/yellow).
Loosen the one screw (5) on the Harness (AC Power) cover (4) of the primary side and the remove the
Cover (4).
(4)
(4)
(3)
(5)
(4)
GT-3 Series
325
Содержание GT-3 Series
Страница 38: ...2 Setting up GT 3 Series 3 Select LocalArea Connection 4 Click the Properties Button GT 3 Series 29 ...
Страница 130: ...6 Replacing Parts Bottom Parts of the Covers 0182Y 0183Y GT 3 Series 121 ...
Страница 375: ...SERVICE MANUAL 2013 Brother Industries Ltd All Rights Reserved GT 3 Series I3010990Z 2013 03 0 ...