3-147
Confidential
(9) Release all the wiring from the Cable rack.
(10) Release the six Hooks and slide the Cable rack in the direction of the arrow and remove it
from the Main body.
Fig. 3-204
(11) Remove the Taptite cup S M3x8 SR screw and fasten the Under bar ground spring to the
Rib of the Main body.
Fig. 3-205
Hook
Cable rack
Hook
Hook
Hook
Process drive unit
Hook
<Left side>
Taptite cup S M3x8 SR
Under bar ground spring
Main body
Rib
<Back side>
Содержание DCP-L8400CDN
Страница 38: ...2 8 Confidential 2 2 2 Scanning part Fig 2 4 Right side Left side Face up Document scanning feed path ...
Страница 249: ...3 85 Confidential 3 Remove the ADF spring from the Upper ADF chute Fig 3 95 ADF spring Upper ADF chute ...
Страница 277: ...3 113 Confidential 9 35 LCD 1 Remove the LCD from the Control panel ASSY Fig 3 145 Control panel ASSY LCD ...
Страница 391: ...5 7 Confidential Common to first and second side Fig 5 1 ...