BOSS
TM
X-POT6+ Operation & Maintenance Manual
(V1.2 September 2017)
Page 29
GENERAL
ACCESS
®
REFER TO CORRESPONDING LETTER IN DRAWING ABOVE
RECOMMENDED GENERAL ACCESS MEASUREMENTS
Maximum height of the tundish above ground
Minimum unobstructed space required above tundish for dosing chemicals
NOTE: ALL MEASUREMENTS ARE FOR GUIDANCE
FRONT
®
TUNDISH
SS
FILTER
VESSEL
DIRTY
FLOW
CLEAN
RETURN
A
DRAIN
D
E
B
C
Unobstructed
area for dosing
Unobstructed
area for
draining
Minimum unobstructed space required beneath unit for draining
Minimum unobstructed space required to the left of unit for servicing.
Minimum unobstructed space required to the right of unit for servicing to install
and service flow and return connections to the system
A
B
C
D
400mm
1300mm
250mm
E
500mm
400mm
INSTALLATION BY QUALIFIED/EXPERIENCED TECHNICIANS ONLY
WARNING!
WEAR APPROPRIATE PPE WHEN
TM
®
OPERATING THE BOSS X-POT6+
SIDE
IV
F
Minimum unobstructed space required to the front of unit for servicing.
F
1000mm