BoLt tIGhtenInG
4. Bolt Tightening notes
Important Note: The 8 off captive nuts, of the top flange plate,
must be tightened to a
torque setting of 40 Nm.
The bolts must be tightened in the following sequence when
standing in front of the vessel looking down.
BOLT TIGHTENING SEQUENCE (all nuts must be tightened to 40Nm torque)
SEQUENCE A
BOLT 8
then BOLT 4
SEQUENCE B
BOLT 2
then BOLT 6
SEQUENCE C
BOLT 1
then BOLT 5
SEQUENCE D
BOLT 3
then BOLT 7
When the BOSS™ X-POT6+ top flange plate is replaced, ensuring the seal faces are clean
and unobstructed.
Ensure the Manual Air Vent spout is positioned directly over the Manual Vent Tundish (14).
The tightening sequence must be repeated 3 times to guarantee that all the
nuts are to the required torque (40Nm).
A proprietary torque wrench must be used to perform this operation, failure to tighten the
nuts to the correct torque may result in leakage, failure of the equipment, damage to the
equipment and potential consequential damage.
5. Electrical Checks & Inspection
To stop electrical equipment (control unit, pumps, valves,
peripheral equipment), cut power to the control unit by turning the
Mains ON/OFF Power Switch (22) through 90
o
to the OFF position.
The power supply must remain off for the period of the work.
It is forbidden to alter or use non-original components or
replacement parts without written authorisation. Such acts may
result in serious personal injury and endanger operational safety.
They will also render any claim for damages against product