4 Installation
Rod source shields LB 8300
20
64217BA2 Rev. 00, 10/2017
4.2
Ambient conditions during assembly
The assembly is made by two ring bolts (Fig. 2, item 1). The minimum permissible
temperature during assembly is -20 °C.
4.3
Intermediate storage of the source
If the source must be intermediately stored at the site of use between delivery
and installation, please observe the following notes:
Store the source exclusively inside a closed and secured shield.
Store the shield in a lockable and properly marked room. The storage room
must comply with the national requirements regarding the storage of
radioactive substances.
Accessible areas of increased radiation exposure must be marked and closed
off, if required.
4.4
Preparing the Installation
IMPORTANT
Size and position of the applicable measuring range are specified in the
project planning phase and determined by means of drawings, sketches or
written notes. During installation, these specifications must be strictly
observed since deviations may lead to malfunction of the measuring system.
To avoid an unnecessary exposure to radiation, the handling period of the source
(even if it is shielded) must be kept as short as possible during installation. It is
therefore recommended to perform the following steps prior to delivery of the
source:
•
Installation planning (incl. estimation of radiation exposure)
•
Instruction of the employees
•
Organising and cleaning the installation site
•
Preparing the required tools and hoisting devices
•
Removing all obstacles which might hinder the installation of the shield or the
source
4.5
Checking the delivery
1.
Check the delivery for completeness using the packing list.
2.
Clean the parts, if required
3.
In the case of damage, immediately notify the forwarding agent and the
manufacturer.
Содержание LB 8300
Страница 1: ...Rod source shields LB 8300 Operating manual 64217BA2 Rev No 00 10 2017 ...
Страница 3: ......