HD-14T Four Post Lift
14
P/N 5900037 — Rev. F — February 2022
Planning for Electrical Work
You will need to have a licensed, certified Electrician available at some point in the installation.
Notify your Electrician in advance so that they come prepared with an appropriate Power Cord with a
Plug for connecting to the power source, a Power Disconnect Switch, and a Thermal Disconnect
Switch.
NOTICE
Wiring must be provided by the Electrician; it is not supplied with the Lift.
⚠
DANGER
All wiring
must
be performed by a licensed, certified Electrician. Verify all electrical
work conforms to all applicable local and national electrical codes, and OSHA rules
and regulations.
Your Electrician needs to:
•
Connect the Power Unit to an electric power source
. An electric power source is
required. The Power Unit comes with a pigtail for wiring to a power source. Have your Electrician
remove the pigtail and wire from inside the Electrical Box on the Power Unit to a Power Cord and
Plug or have them wire it directly into the electrical system at the Lift location protected by an
appropriate circuit breaker.
Note
:
Installing the Power Unit and connecting the Power Unit to the power source are
separate
procedures and are completed at different times in the installation process. You
do not need an Electrician to install the Power Unit, but an Electrician is
required
to
connect the Power Unit to the power source.
•
Install a Power Disconnect Switch
. Ensures you can quickly and completely interrupt
electrical power to the Lift in the event of an electrical circuit fault, emergency situation, or when
equipment is undergoing service or maintenance. Put it within sight and reach of the Lift operator.
•
Install a Thermal Disconnect
. Ensures the equipment shuts down in the event of an overload
or an overheated motor.
Electrical Information
⚠
DANGER
All wiring
must
be performed by a licensed, certified Electrician in accordance with
national and local codes. Do not perform any maintenance until main electrical
power has been disconnected from the Lift and cannot be re-energized until all
procedures are complete.
Important electrical information:
•
Improper electrical installation can damage the Power Unit motor, which is not covered by the
warranty.
•
The Lift uses electrical energy; if your organization has Lockout/Tagout policies, make sure to
implement them after connecting to a power source.
•
Use a separate circuit breaker for each Power Unit.
•
Protect each circuit with a time delay fuse or circuit breaker:
-
For a 208 to 230 VAC, single phase circuit, use a 25 amp fuse.
-
For a 208 to 230 VAC, three phase circuit, use a 20 amp fuse.
-
For a 380 to 440 VAC, three phase circuit, use a 15 amp fuse.
Содержание HD-14T
Страница 7: ...HD 14T Four Post Lift 7 P N 5900037 Rev F February 2022 Components ...
Страница 9: ...HD 14T Four Post Lift 9 P N 5900037 Rev F February 2022 Specifications ...
Страница 67: ...HD 14T Four Post Lift 67 P N 5900037 Rev F February 2022 Wiring Diagrams ...
Страница 68: ...HD 14T Four Post Lift 68 P N 5900037 Rev F February 2022 Labels ...
Страница 69: ...HD 14T Four Post Lift 69 P N 5900037 Rev F February 2022 ...
Страница 70: ...HD 14T Four Post Lift 70 P N 5900037 Rev F February 2022 ...
Страница 71: ...HD 14T Four Post Lift 71 P N 5900037 Rev F February 2022 Parts Drawings ...
Страница 72: ...HD 14T Four Post Lift 72 P N 5900037 Rev F February 2022 ...
Страница 73: ...HD 14T Four Post Lift 73 P N 5900037 Rev F February 2022 ...
Страница 75: ...HD 14T Four Post Lift 75 P N 5900037 Rev F February 2022 Maintenance Log ...
Страница 76: ...1645 Lemonwood Drive Santa Paula CA 93060 USA 2022 BendPak Inc All rights reserved bendpak com ...