HD-14T Four Post Lift
31
P/N 5900037 — Rev. F — February 2022
4.
Bolt both Runways into place, two Hex Head Bolts on each end of the Runways.
Drawing shows how to
secure the Runways to the
Crosstubes.
Two Bolts on each end of the
Runway.
Not all components shown
.
Important
: The Offside Runway
must
be bolted on both ends when using Rolling Jack.
5.
Make sure that the Primary Locks are engaged.
⚠
WARNING
Do not continue with the installation until you have visually confirmed that all four
Safety Locks are engaged. If they are not engaged, the Runways could move or
fall, possibly causing personal injury or product damage.
Before routing the Cables, extend the Piston on the Hydraulic Cylinder.
To extend the Piston
:
Remove the Shipping Plug from the Return Line Connector. The Return Line Connector is on the
Cylinder end closest to where the Power Unit will be.
6.
Attach an air pressure source to the Return Line Connector.
7.
Use the air pressure to extend the Hydraulic Cylinder’s Piston and Retainer Plate.
Do not exceed
50 psi
.
Содержание HD-14T
Страница 7: ...HD 14T Four Post Lift 7 P N 5900037 Rev F February 2022 Components ...
Страница 9: ...HD 14T Four Post Lift 9 P N 5900037 Rev F February 2022 Specifications ...
Страница 67: ...HD 14T Four Post Lift 67 P N 5900037 Rev F February 2022 Wiring Diagrams ...
Страница 68: ...HD 14T Four Post Lift 68 P N 5900037 Rev F February 2022 Labels ...
Страница 69: ...HD 14T Four Post Lift 69 P N 5900037 Rev F February 2022 ...
Страница 70: ...HD 14T Four Post Lift 70 P N 5900037 Rev F February 2022 ...
Страница 71: ...HD 14T Four Post Lift 71 P N 5900037 Rev F February 2022 Parts Drawings ...
Страница 72: ...HD 14T Four Post Lift 72 P N 5900037 Rev F February 2022 ...
Страница 73: ...HD 14T Four Post Lift 73 P N 5900037 Rev F February 2022 ...
Страница 75: ...HD 14T Four Post Lift 75 P N 5900037 Rev F February 2022 Maintenance Log ...
Страница 76: ...1645 Lemonwood Drive Santa Paula CA 93060 USA 2022 BendPak Inc All rights reserved bendpak com ...