HD-14T Four Post Lift
19
P/N 5900037 — Rev. F — February 2022
Unloading and Unpacking
Once the components are unloaded, they are your responsibility to move around. As the Lift includes a
number of heavy pieces, the closer you unload them to the installation location, the better off you are.
⚠
CAUTION
Some Lift components are very heavy; if handled incorrectly, they can damage
materials like tile, sandstone, and brick. Try to handle the Lift components twice:
once when delivered and once when moved into position. You must have a Forklift
or Shop Crane to move them into position. Use care when moving them.
⚠
WARNING
The Posts and Runways are delivered with stabilizing structures on each end. Be
very careful when removing these stabilizing structures; the Posts and Runways
can shift or even fall. If they fall on a person, they could cause serious injury.
Содержание HD-14T
Страница 7: ...HD 14T Four Post Lift 7 P N 5900037 Rev F February 2022 Components ...
Страница 9: ...HD 14T Four Post Lift 9 P N 5900037 Rev F February 2022 Specifications ...
Страница 67: ...HD 14T Four Post Lift 67 P N 5900037 Rev F February 2022 Wiring Diagrams ...
Страница 68: ...HD 14T Four Post Lift 68 P N 5900037 Rev F February 2022 Labels ...
Страница 69: ...HD 14T Four Post Lift 69 P N 5900037 Rev F February 2022 ...
Страница 70: ...HD 14T Four Post Lift 70 P N 5900037 Rev F February 2022 ...
Страница 71: ...HD 14T Four Post Lift 71 P N 5900037 Rev F February 2022 Parts Drawings ...
Страница 72: ...HD 14T Four Post Lift 72 P N 5900037 Rev F February 2022 ...
Страница 73: ...HD 14T Four Post Lift 73 P N 5900037 Rev F February 2022 ...
Страница 75: ...HD 14T Four Post Lift 75 P N 5900037 Rev F February 2022 Maintenance Log ...
Страница 76: ...1645 Lemonwood Drive Santa Paula CA 93060 USA 2022 BendPak Inc All rights reserved bendpak com ...