13.2 Dismantling work
For dismantling work to be carried out, the following prerequisites must be fulfilled and the preparatory tasks must have
been completed.
Prerequisites
Tools
Material
Protective equipment
• Spanner or adjustable end wrench
• No material necessary
Always to be worn:
Preparatory tasks
1.
Decommissioning has been completed.
2.
Depressurise the pressurised system or the respective system section and secure it against unintentional
pressurisation.
Dismantling work
Illustration
Description / explanation
X4
X3
X4
F
F
X3
X5
X5
24
24
1. Remove the hose
[X5]
from the hose connection
[24]
and disassemble.
2. Remove the condensate inlet line
[X3]
and the
recommended shut-off valve
[X4]
from the condensate
inlet
[F]
and disassemble.
3. Disassemble all power supplies.
BEKOMAT
®
13i / 13i CO / 13i CO PN50
Original installation and operation manual
68 | 76
Содержание BEKOMAT BM13i
Страница 73: ...Original installation and operation manual BEKOMAT 13i 13i CO 13i CO PN50 73 76 ...
Страница 74: ...16 2 Declaration of Conformity BEKOMAT 13i 13i CO 13i CO PN50 Original installation and operation manual 74 76 ...
Страница 75: ...Original installation and operation manual BEKOMAT 13i 13i CO 13i CO PN50 75 76 ...