8.2 Commissioning work
Illustration
Description / explanation
X4
X3
X4
X3
1. Connect the voltage supply.
0
The
BEKOMAT
®
carries out the power-on self-test.
2. Slowly pressurise the system (e.g. by slowly opening
the recommended shut-off valve
[X4]
in the
condensate inlet line
[X3]
).
3. Carry out a functional test (see “10.3.2 Functional test”
BEKOMAT
®
13i / 13i CO / 13i CO PN50
Original installation and operation manual
46 | 76
Содержание BEKOMAT BM13i
Страница 73: ...Original installation and operation manual BEKOMAT 13i 13i CO 13i CO PN50 73 76 ...
Страница 74: ...16 2 Declaration of Conformity BEKOMAT 13i 13i CO 13i CO PN50 Original installation and operation manual 74 76 ...
Страница 75: ...Original installation and operation manual BEKOMAT 13i 13i CO 13i CO PN50 75 76 ...