Connection work - series connection
Illustration
Description / explanation
4
X8
5 6
B
X7
C
4
5
6
7. Fit the cable gland components
[4, 5, 6]
over the
connection cable
[X7]
and insert the connection
cable
[X8]
.
8. Insert the connection cable
[X8]
into the
left cable gland
[C]
.
9. Insert the connection cable
[X7]
into the
right cable gland
[B]
.
Connection cable
[X7]
Connection cable
[X8]
10. Connect connection cable
[X7]
and connection
cable
[X8]
according to the terminal diagram “4.9
Terminal diagram power control board” on Page 32.
B 4
C 4
X7
5
6
X8
5
6
45
11. Draw cable
[X7]
and connection cable
[X8]
taut.
12. Screw the cable gland components
[4, 5, 6]
onto the
right cable gland
[B]
and the left cable gland
[C]
.
13. Fit the screw terminal
[45]
.
2
1
14. Set the top cover
[2]
in place and insert the screws
[1]
.
15. Tighten the screws
[1]
with a torque of
0.5 Nm +0.5 Nm (0.37 ft-lb +0.37 ft-lb).
BEKOMAT
®
13i / 13i CO / 13i CO PN50
Original installation and operation manual
44 | 76
Содержание BEKOMAT BM13i
Страница 73: ...Original installation and operation manual BEKOMAT 13i 13i CO 13i CO PN50 73 76 ...
Страница 74: ...16 2 Declaration of Conformity BEKOMAT 13i 13i CO 13i CO PN50 Original installation and operation manual 74 76 ...
Страница 75: ...Original installation and operation manual BEKOMAT 13i 13i CO 13i CO PN50 75 76 ...