10.2 Maintenance schedule
Maintenance
Interval
Wear part replacement
After 8760 operating hours or 1 million switching cycles*; at least annually
Cleaning
Annually
Functional test
Monthly
Visual inspection
Weekly
Leakage test
After assembly and maintenance works on the product
* based on 7 bar(g) (101.5 psi(g)) and pH-neutral condensate
INFORMATION
Carrying out cleaning work
i
Carry out cleaning work during wear part replacement since all parts are disassembled at
this point.
10.3 Maintenance work
For maintenance work to be carried out, the following prerequisites must be fulfilled and the preparatory tasks must
have been completed.
Prerequisites
Tools
Material
Protective equipment
•
Screwdriver – flat head
size 2.5 mm (0.09")
• Spanner or adjustable end wrench
• Sealants
• Suitable lubricant for greasing the
O-rings
• Mild cleaning agent
• Cotton or disposable cloth
Always to be worn:
Preparatory tasks
1.
Decommissioning and disassembly of the
BEKOMAT
®
have been completed.
Original installation and operation manual
BEKOMAT
®
13i / 13i CO / 13i CO PN50
51 | 76
Содержание BEKOMAT BM13i
Страница 73: ...Original installation and operation manual BEKOMAT 13i 13i CO 13i CO PN50 73 76 ...
Страница 74: ...16 2 Declaration of Conformity BEKOMAT 13i 13i CO 13i CO PN50 Original installation and operation manual 74 76 ...
Страница 75: ...Original installation and operation manual BEKOMAT 13i 13i CO 13i CO PN50 75 76 ...