Commissioning
EL125x, EL2258
68
Version: 2.5
Fig. 73: Sample program with variables after a compile process (without variable integration)
The control program is now created as a project folder, followed by the compile process:
Fig. 74: Start program compilation
The following variables, identified in the ST/ PLC program with "AT%", are then available in under
"Assignments" in the project folder explorer:
Assigning variables
Via the menu of an instance - variables in the "PLC” context, use the "Modify Link…" option to open a
window for selecting a suitable process object (PDO) for linking:
Содержание EL1258
Страница 2: ......
Страница 6: ...Table of contents EL125x EL2258 6 Version 2 5...
Страница 42: ...Mounting and wiring EL125x EL2258 42 Version 2 5 Fig 36 Other installation positions...
Страница 76: ...Commissioning EL125x EL2258 76 Version 2 5 Fig 86 Incorrect driver settings for the Ethernet port...