1 EHC–06 central unit PCB: control system for the heat pump and
the first heating circuit (direct zone)
2 Position for an optional control system PCB: manages a second
heating circuit or a solar circuit
3 HPC–01 PCB: PCB for interface with the outdoor unit
4 Space for an optional ACI BDR PCB for a titanium anode
5 Position of the Bluetooth card at the rear of the control panel
bracket
4.2
Control panel description
4.2.1
Description of the keys
1
h
: back to the previous level without saving the modifications
made
: manual reset
2
: accessing the heating parameters
: lowering the value
3
: accessing the domestic hot water parameters
: raising the value
4
: MODE display
: accessing the menu selected or confirming the value
modification
4.2.2
Description of the display
Hydraulic back-up
Hydraulic back-up in demand
Electrical back-up
Stage 1 of the electrical back-up
Stage 2 of the electrical back-up
Fig.16
Position of the PCBs
MW
-30
0
06
8
2-
2
5
1
2
3
4
Fig.17
MW
-1
0
0
0
0
4
3
-5
1
2
3
4
Fig.18
MW
-1
0
0
0
6
6
9
-2
Fig.19
MW
-1
0
0
0
6
6
5
-2
4 Description of the product
7654506 - v06 - 19112019
27
Содержание MIC V200
Страница 138: ...14 Appendix 138 7654506 v06 19112019 ...
Страница 140: ...7654506 v06 19112019 7654506 001 06 ...