
Temp diff ON buffer storage
tank
(3813)
Temp diff OFF buffer storage
tank
(3814)
Charging temp min buffer
storage tank
(3815)
For charging the storage tank via the heat exchanger a sufficiently large tempera-
ture difference between the collector and storage tank is necessary. In addition
the collector must have reached the minimum charging temperature.
Fig. 24: Storage tank charging
Tcol
Tcmin
On
Off
TSt
SdOn
SdOff
Tcol
ON/OFF
SdON
SdOFF
Tcmin
Collector temp
Charging ON or OFF
Temp diff ON
Temp diff OFF
Charging temp min buffer storage tank
Temp diff ON swi pool
(3816)
Temp diff OFF swi pool
(3817)
For exceeding or not reaching the difference between solar collector temperature
and swimming pool temperature, the solar pump is switched on and off.
Charging temp min swi pool
(3818)
Temperatures that the collector must have at the least in order to begin charging
a swimming pool.
Charging prio storage tank
(3822)
For several combined exchangers in the system, the loading sequence for the
combined storage tank can be defined by setting the loading priority.
None:
each storage tank is loaded alternately for a temperature increase of 5°C,
until each setpoint has reached level A, B or C (see
Tab. 6 (Page 96)
). If all setpo-
ints are reached, the setpoint of the next level is approached.
DHW storage tank:
The DHW storage tank is preferred during solar charging. It is
charged in each level A, B or C (see below) with priority. Only afterward is the fol-
lowing consumer in the same level charged. As soon as all setpoints in one level
are reached, the ones in the next level are approached, whereby the DHW storage
tank again has priority.
Buffer storage tank:
The buffer storage tank is preferred during soar charging. It is
charged in each level A, B or C (see
Tab. 6 (Page 96)
) with priority. Only after-
ward is the consumer next to it in the same level charged. As soon as all setpoints
in one level are reached, the ones in the next level are approached, whereby the
buffer storage tank again has priority.
Programming
358 436 08.10
95
Содержание LUNA HT 1.280
Страница 1: ...Installation operation and maintenance manual Condensing gas boiler Power HT 1 230 1 280 1 320...
Страница 8: ...2 6 Conformity declaration Safety 8 358 436 08 10...
Страница 10: ...Technical Data 10 358 436 08 10...
Страница 12: ...Technical Data 12 358 436 08 10...
Страница 13: ...3 3 Wiring Diagram Fig 2 Wiring Diagram Technical Data 358 436 08 10 13...
Страница 21: ...Before installation 358 436 08 10 21...
Страница 23: ...Wiring plan Before installation 358 436 08 10 23...
Страница 25: ...Wiring plan Before installation 358 436 08 10 25...
Страница 27: ...Wiring plan Before installation 358 436 08 10 27...
Страница 29: ...Wiring plan right EC three Before installation 358 436 08 10 29...
Страница 30: ...Wiring plan left EC three Before installation 30 358 436 08 10...
Страница 31: ...4 9 Legend Before installation 358 436 08 10 31...
Страница 126: ...Fig 30 Boiler view Maintenance 126 358 436 08 10 gas connection supply air conntection heating return heating flow...
Страница 142: ...Space for notes 142 358 436 08 10...
Страница 143: ...Space for notes 358 436 08 10 143...