![Baxi LUNA HT 1.280 Скачать руководство пользователя страница 87](http://html1.mh-extra.com/html/baxi/luna-ht-1-280/luna-ht-1-280_installation-operation-and-maintenance-manual_2711826087.webp)
Fig. 20: Release according to time switching programme 4 (example)
Charging priority
(1630)
This function ensures that the boiler capacity is primarily made available for DHW
in case of simultaneous capacity demand by room heatings and DHW.
-
Absolute priority
: Mixer and pumped heating circuits are blocked until the DHW
has been heated up.
-
Sliding priority
: Should the boiler capacity not be sufficient to heat up DHW, mi-
xer and pumped heating circuits will be restricted.
-
No priority
: Charging DHW is carried out in parallel with heating operation.
-
Mixer heating circuit sliding, pumped heating circuit absolute
: The pumped hea-
ting circuits are blocked until DHW has been heated up. Should the boiler capa-
city not be sufficient, also the mixer circuit will be restricted.
Legionella function
(1640)
Function to kill legionella germs by heating up to the set legionella function set-
point (see programme number 1645).
-
Off
: Legionella function is switched off.
-
Periodisch
: Legionella function is repeated periodically, depending on the set va-
lue (prog. no. 1641).
-
Fixer Wochentag
: Legionella function will be activated on a certain weekday
(prog. no. 1642).
Legionella funct periodically
(1641)
Setting the interval for the
legionella function periodically
(recommended setting
in case of additional drinking water heating by solar plant in connection with a st
tankmixing pump).
Legionella funct weekday
(1642)
Selection of the weekday for the legionella function
fixed weekday
(factory set-
ting).
Legionella funct time
(1644)
Setting the start time for the legionella function. The legionella function will be
carried out at the first release of the DHW preparation with the setting "---".
Legionella funct setpoint
(1645)
Setting the temperature setpoint for killing the germs.
Legionella function duration
(1646)
With this function, the time will be set, during which the legionella function set-
point is activated to kill germs.
If the colder storage temperature rises above the
legionella function setpoint
by -1
K, the
legionella function setpoint
is assumed as met and the timer starts running.
If the storage temperature drops by more than the switching diff2 K be-
low the required
legionella function setpoint
, the duration has to be met again. If
no duration has been set, the legionella function has been met immediately on re-
aching the
legionella function setpoint
.
Programming
358 436 08.10
87
Содержание LUNA HT 1.280
Страница 1: ...Installation operation and maintenance manual Condensing gas boiler Power HT 1 230 1 280 1 320...
Страница 8: ...2 6 Conformity declaration Safety 8 358 436 08 10...
Страница 10: ...Technical Data 10 358 436 08 10...
Страница 12: ...Technical Data 12 358 436 08 10...
Страница 13: ...3 3 Wiring Diagram Fig 2 Wiring Diagram Technical Data 358 436 08 10 13...
Страница 21: ...Before installation 358 436 08 10 21...
Страница 23: ...Wiring plan Before installation 358 436 08 10 23...
Страница 25: ...Wiring plan Before installation 358 436 08 10 25...
Страница 27: ...Wiring plan Before installation 358 436 08 10 27...
Страница 29: ...Wiring plan right EC three Before installation 358 436 08 10 29...
Страница 30: ...Wiring plan left EC three Before installation 30 358 436 08 10...
Страница 31: ...4 9 Legend Before installation 358 436 08 10 31...
Страница 126: ...Fig 30 Boiler view Maintenance 126 358 436 08 10 gas connection supply air conntection heating return heating flow...
Страница 142: ...Space for notes 142 358 436 08 10...
Страница 143: ...Space for notes 358 436 08 10 143...