5.12 Electrical connection
(general)
Danger of electric shock!
All electrical work in connection with the installation must only be carried out by a
trained electrician!
- Mains Voltage AC 230 V +6% -10%, 50 Hz
In Germany the VDE and local regulations and in all other countries, the pertinent
regulations should be followed during installation.
The electrical connection has to be carried out unmistakably regarding terminal
and terminal direction. In Germany, the connection can be carried out with an ac-
cessible, unmistakable plug-in connection or as a fixed connection. In all other
countries, a fixed connection has to be carried out.
It is recommended , to install a main switch before the Power HT. This
should switch off all poles and have a contact opening width of at least 3 mm.
All connected components must comply to VDE. Connecting lines have to be in-
stalled strain relieved.
Cable lengths
Bus / sensor cables
do not carry mains voltage, but protective low voltage. They
must not be routed in
parallel to the mains cables
(interference signals). Otherwi-
se screen cables should be used.
Permissible cable lengths for all sensors:
- Cu-cable up to 20m: 0.8 mm
2
- Cu-cable up to 80m: 1 mm
2
- Cu-cable up to 120m: 1.5 mm
2
Strain reliefs
All electrical cables have to be installed from the boiler rear wall to the boiler
switch panel. Here, the lines have to be fixed into the strain relief of the switching
panel and to be connected according to the wiring diagram (
Fig. 8
).
Fig. 8: Strain relief
1
2
3
4
C0000654
Circulating pumps
The permissible current load per pump connection is I
N max
= 1 Amp.
Fuses
Fuses in the Control Unit ISR:
- Mains fuse: T 6,3A H 250V
Installation
38
358 436 08.10
Содержание LUNA HT 1.280
Страница 1: ...Installation operation and maintenance manual Condensing gas boiler Power HT 1 230 1 280 1 320...
Страница 8: ...2 6 Conformity declaration Safety 8 358 436 08 10...
Страница 10: ...Technical Data 10 358 436 08 10...
Страница 12: ...Technical Data 12 358 436 08 10...
Страница 13: ...3 3 Wiring Diagram Fig 2 Wiring Diagram Technical Data 358 436 08 10 13...
Страница 21: ...Before installation 358 436 08 10 21...
Страница 23: ...Wiring plan Before installation 358 436 08 10 23...
Страница 25: ...Wiring plan Before installation 358 436 08 10 25...
Страница 27: ...Wiring plan Before installation 358 436 08 10 27...
Страница 29: ...Wiring plan right EC three Before installation 358 436 08 10 29...
Страница 30: ...Wiring plan left EC three Before installation 30 358 436 08 10...
Страница 31: ...4 9 Legend Before installation 358 436 08 10 31...
Страница 126: ...Fig 30 Boiler view Maintenance 126 358 436 08 10 gas connection supply air conntection heating return heating flow...
Страница 142: ...Space for notes 142 358 436 08 10...
Страница 143: ...Space for notes 358 436 08 10 143...