2.3 Regulations and standards
The installation should comply with relevant British Standard Specifications, Co-
des of Practice and current Building Regulations, together with any special regio-
nal requirements of the Local Authorities, Gas undertaking and Insurance I.E.E. Re-
gulations for the Electrical Equipment of Buildings. The installation of the boiler
must be in accordance with the relevant requirements of:
- Health and Safety at Work act 1974
- Building Regulations 2006
- Electricity at Work Regulation 1989
- Management of H&S at Work Regulations 1998
- Manual Handling Regulations 1992
- Model Water By-Laws 1986
- BS 7671: 1992 - Requirements for Electrical Installations, IEE Wiring, Regulations
16th Edition
- BS 5440: 2000: Part 1 - Specifications for Installation of Flues
- BS 5440: 2000: Part 2 - Specifications for Installation of Ventilation for Gas Ap-
pliances
- BS 6644: 2005 - Installation of Gas Fired Hot Water Boilers for inputs between
60 kW and 2 MW
- BS 7074: 1989: Part 2 - application Selection and Installation of Expansion Ves-
sels and Ancillary Equipment for Sealed Water Systems
- BS 6880: 1988 - codes of Practice for Low temperature Hot Water Systems
- EN 677: 1997 - Gas Fired Central Heating Boilers for Condensing Boilers with a
nominal heat input not exceeding 70 kW
- CP 342:2 - Centralised Hot Water Supply Gas Safety (Installation and Use) Regu-
lations 1998
- IM/II - Flues for commercial and Industrial Gas Fired Boilers and Air Heaters
- IGE/UP/1 - Soundness Testing and Purging Procedure for Non Domestic Installa-
tions
- IGE/UP/2 - Gas Installation Pipe work, Boosters and Compressors for Industrial
Commercial Premises
Manufacturer's notes must not be taken in any way as over-riding statutory obli-
gations.
2.4 Liquid gas under ground
The Power HT three complies with DIN EN 126 and DIN EN 298 and, therefore
does not need an additional shut-off valve for operation with liquid gas under
ground
2.5 CE-Marking
The CE-marking means that the gas condensing boilers meet the requirements of
the gas devices guideline 90/396/EWG, the low voltage guideline 73/23/EWG, as
well as, the guideline 89/336/EWG (electro-magnetic compatibility, EMV) of the
Commission to balance the legal regulations of the member states.
Meeting the protection requirements according to guideline 04/108/EG is only gu-
aranteed by operation of the boiler according to purpose.
The ambient conditions according EN 55014 must be met.
Operation is only allowed with correctly fitted casing.
Correct electrical earthing has to be ensured by regular check (e.g. annual inspecti-
on).
When replacing device parts, only original parts as specified by the manufacturer
must be used.
The gas condensing-boilers fulfill the basic requirements of the Efficiency Guideli-
ne 92/42/EWG as condensing boiler.
When natural gas is used, the gas condensing-boiler emit less than 80
mg
/
kWh
NO
X
corresponding to the requirements as per §7 of the Ordinance regarding small fi-
ring places dated 14.03.1997 (1. BImSchV).
Safety
358 436 08.10
7
Содержание LUNA HT 1.280
Страница 1: ...Installation operation and maintenance manual Condensing gas boiler Power HT 1 230 1 280 1 320...
Страница 8: ...2 6 Conformity declaration Safety 8 358 436 08 10...
Страница 10: ...Technical Data 10 358 436 08 10...
Страница 12: ...Technical Data 12 358 436 08 10...
Страница 13: ...3 3 Wiring Diagram Fig 2 Wiring Diagram Technical Data 358 436 08 10 13...
Страница 21: ...Before installation 358 436 08 10 21...
Страница 23: ...Wiring plan Before installation 358 436 08 10 23...
Страница 25: ...Wiring plan Before installation 358 436 08 10 25...
Страница 27: ...Wiring plan Before installation 358 436 08 10 27...
Страница 29: ...Wiring plan right EC three Before installation 358 436 08 10 29...
Страница 30: ...Wiring plan left EC three Before installation 30 358 436 08 10...
Страница 31: ...4 9 Legend Before installation 358 436 08 10 31...
Страница 126: ...Fig 30 Boiler view Maintenance 126 358 436 08 10 gas connection supply air conntection heating return heating flow...
Страница 142: ...Space for notes 142 358 436 08 10...
Страница 143: ...Space for notes 358 436 08 10 143...