Set the required room temperature on the rotating knob of the control unit
6.3 Temperatures for heating
and drinking water
The information in the section
Programming
for setting the temperatures for hea-
ting and domestic hot water.
Note:
The times for DHW will be set in time programme 4/ TWW.
For reasons of
comfort, the start of DHW heating should be approximately 1 hour before start of
heating!
6.4 Individual time programme
The gas condensing boiler can be commissioned having its standard values.
For setting e.g. an individual time programme, please observe section
Programm-
ing
(tab. 5)
.
6.5 Instruction for the customer
Instruction
The customer should be instructed in the operation of the boiler and the function
of the safety devices. The following should be pointed out:
- the air inlet must not be restricted;
- flammable materials and liquids must not be stored in the vicinity of the gas
boiler;
- the customer has to carry out the following control checks himself:
- pressure check on the manometer;
- check the discharge from the safety valve;
- only approved gas installers may carry out the inspection and maintenance.
Documents
- The documents, belonging to the boiler, have to be handed over with the instru-
ctions they have to be kept in the installation room of the boiler.
- Copy the commissioning sheet with confirmation and legally binding signature
to the customer. All components have been installed according to the instructi-
on of the manufacturer. The whole plant complies with the relevant British
Standards and current Building Regulations.
Commissioning
358 436 08.10
41
Содержание LUNA HT 1.280
Страница 1: ...Installation operation and maintenance manual Condensing gas boiler Power HT 1 230 1 280 1 320...
Страница 8: ...2 6 Conformity declaration Safety 8 358 436 08 10...
Страница 10: ...Technical Data 10 358 436 08 10...
Страница 12: ...Technical Data 12 358 436 08 10...
Страница 13: ...3 3 Wiring Diagram Fig 2 Wiring Diagram Technical Data 358 436 08 10 13...
Страница 21: ...Before installation 358 436 08 10 21...
Страница 23: ...Wiring plan Before installation 358 436 08 10 23...
Страница 25: ...Wiring plan Before installation 358 436 08 10 25...
Страница 27: ...Wiring plan Before installation 358 436 08 10 27...
Страница 29: ...Wiring plan right EC three Before installation 358 436 08 10 29...
Страница 30: ...Wiring plan left EC three Before installation 30 358 436 08 10...
Страница 31: ...4 9 Legend Before installation 358 436 08 10 31...
Страница 126: ...Fig 30 Boiler view Maintenance 126 358 436 08 10 gas connection supply air conntection heating return heating flow...
Страница 142: ...Space for notes 142 358 436 08 10...
Страница 143: ...Space for notes 358 436 08 10 143...