
5.11 Check and adjust CO2
content
Fig. 7: Gas valve
1
2
3
4
5
1 Compensation line
4 Gas pressure monitor
2 Adjustment screw for full load (Allen key 3 mm)
5 Adjustment screw for low load (Torx TX 40)
3 Measuring nozzle for inlet pressure
Set
CO
2
-content at max. output
1. Power HT in the controller stop mode (refer to previous section) ope-
rated at mfull load
2. Remove safety cap from the adjustment screw for full load (2)
3. Set CO
2
content on the adjustment screw for full load (2) according to
Technical
Data
section with a 3 mm Allen key
- Clockwise: CO
2
content is decreased
- Counter-clockwise: CO
2
content is increased
4. Replace safety cap on the adjusting screw for full load (2)
Set
CO
2
-content at min. output
1. Power HT in the controller stop mode (refer to previous section) ope-
rated at low load
2. Remove safety cap from the adjustment screw for small load (5)
3. Set CO
2
content on the adjustment screw for small load (5) according to
Techni-
cal Data
section with a Torx key TX 40
- Clockwise: CO
2
-content is increased
- Counter-clockwise: CO
2
is reduced
4. Replace safety cap on the adjusting screw for low load (5)
Note: After successful adjustment of the gas valve, the CO
2
content must again be
controlled at maximum and minimum output and corrected if necessary
Installation
358 436 08.10
37
Содержание LUNA HT 1.280
Страница 1: ...Installation operation and maintenance manual Condensing gas boiler Power HT 1 230 1 280 1 320...
Страница 8: ...2 6 Conformity declaration Safety 8 358 436 08 10...
Страница 10: ...Technical Data 10 358 436 08 10...
Страница 12: ...Technical Data 12 358 436 08 10...
Страница 13: ...3 3 Wiring Diagram Fig 2 Wiring Diagram Technical Data 358 436 08 10 13...
Страница 21: ...Before installation 358 436 08 10 21...
Страница 23: ...Wiring plan Before installation 358 436 08 10 23...
Страница 25: ...Wiring plan Before installation 358 436 08 10 25...
Страница 27: ...Wiring plan Before installation 358 436 08 10 27...
Страница 29: ...Wiring plan right EC three Before installation 358 436 08 10 29...
Страница 30: ...Wiring plan left EC three Before installation 30 358 436 08 10...
Страница 31: ...4 9 Legend Before installation 358 436 08 10 31...
Страница 126: ...Fig 30 Boiler view Maintenance 126 358 436 08 10 gas connection supply air conntection heating return heating flow...
Страница 142: ...Space for notes 142 358 436 08 10...
Страница 143: ...Space for notes 358 436 08 10 143...