![Baxi LUNA HT 1.280 Скачать руководство пользователя страница 33](http://html1.mh-extra.com/html/baxi/luna-ht-1-280/luna-ht-1-280_installation-operation-and-maintenance-manual_2711826033.webp)
Modell
Flue Size
Maximum Flue Length
incl. one 87° elbow
Power HT .1230
Ø 160 mm
30 m
Power HT .1230
Ø 200 mm
60 m
Power HT .1280
Ø 160 mm
18 m
Power HT .1320
Ø 160 mm
8 m
Power HT .1320
Ø 200 mm
60 m
Power HT .1280
Ø 200 mm
60 m
These lengths only apply to single boilers. For more elbows the following deducti-
ons should be made:
1 x elbow 87°: 5 m
1 x elbow 45°: 2 m
For installation of multiple boilers, a flue specialist should be instructed to assist.
Standards
Flue systems should meet the applicable sections of:
- BS6644.
- CIBSE Applications Manual AM14 Non-Domestic Hot Water Heating Systems
- Clean Air Act 1993
- the current Building Regulations must also be strictly observed
The boiler should be installed in accordance with BS6644 with respect to protec-
ting the boiler from damage, air for combustion and ventilation, discharge of pro-
ducts of combustion, clearances for service and access, temperatures, noise levels,
the disposal of boiler water and the effects of flooding of the boiler house or see-
page from roof top boiler house.
5.5 Gas connection
The gas side connection must only be carried out by an approved heating specia-
list. For the gas side installation and setting, the factory setting data of the equip-
ment and optional label should be compared with the local supply conditions.
Residues in pipes and pipe joints should be removed.
Installation
358 436 08.10
33
Содержание LUNA HT 1.280
Страница 1: ...Installation operation and maintenance manual Condensing gas boiler Power HT 1 230 1 280 1 320...
Страница 8: ...2 6 Conformity declaration Safety 8 358 436 08 10...
Страница 10: ...Technical Data 10 358 436 08 10...
Страница 12: ...Technical Data 12 358 436 08 10...
Страница 13: ...3 3 Wiring Diagram Fig 2 Wiring Diagram Technical Data 358 436 08 10 13...
Страница 21: ...Before installation 358 436 08 10 21...
Страница 23: ...Wiring plan Before installation 358 436 08 10 23...
Страница 25: ...Wiring plan Before installation 358 436 08 10 25...
Страница 27: ...Wiring plan Before installation 358 436 08 10 27...
Страница 29: ...Wiring plan right EC three Before installation 358 436 08 10 29...
Страница 30: ...Wiring plan left EC three Before installation 30 358 436 08 10...
Страница 31: ...4 9 Legend Before installation 358 436 08 10 31...
Страница 126: ...Fig 30 Boiler view Maintenance 126 358 436 08 10 gas connection supply air conntection heating return heating flow...
Страница 142: ...Space for notes 142 358 436 08 10...
Страница 143: ...Space for notes 358 436 08 10 143...