Manual 2100-642
Page
28 of 82
FIGURE 1.19
Bard-Link
TM
LC5000-100 Controller Circuit Install
6. Supply Wiring
The LC5000-100 controller is powered by 120/208/230 from the shelter. Field-supplied supply wiring should be
minimum 16 guage, maximum 14 guage (see Figure 1.19). A reliable earth ground must be connected in addition
to any grounding from conduit. Grounding posts are included with the controller for this purpose; install as shown in
Figure 1.20.
Failing to ground the controller box properly could result in damage to the equipment.
FIGURE 1.20
Controller Grounding Posts
A reliable earth ground must be connected in
addition to any grounding from conduit. Attach
earth ground to dedicated lugs on side of controller
box.
Failing to ground the controller box properly
could result in damage to the equipment.
See Terminal Block Index
on following page.
Содержание W48A2PQ
Страница 6: ...Manual 2100 642 Page 6 of 82...
Страница 7: ...Manual 2100 642 Page 7 of 82 SECTION 1 INSTALLATION INSTRUCTIONS...
Страница 35: ...Manual 2100 642 Page 35 of 82 SECTION 2 SERVICE INSTRUCTIONS...
Страница 62: ...Manual 2100 642 Page 62 of 82...
Страница 63: ...Manual 2100 642 Page 63 of 82 SECTION 3 APPENDIX...