Manual 2100-676B
Page
59 of 88
FIGURE 8
Mounting Instructions
A
17
"
17
"
17
"
17
"
B
16.25
"
E
D
Suppl
yA
ir
Opening
Re
tu
rn
Ai
rOpening
W
ALL
W
all
Opening
and
Hole
Lo
ca
tion
View
A
B
C
D
E
RE
QU
IR
ED
DI
M
EN
SI
ON
S T
O
M
AI
NTAI
N
1/
4"
M
IN
.
CL
EA
RA
NC
E F
RO
M
CO
M
BU
STIB
LE
M
ATE
RIA
LS
30
1/
2
10
1/
2
6
1/
4
2
3/
4
29
3/
4
RE
QU
IR
ED
DI
M
EN
SI
ON
S T
O
M
AI
NTAI
N
1"
M
IN
.C
LEA
RA
NC
E
FR
OM
CO
M
BU
STIB
LE
M
ATE
RIA
LS
32
12
5
1/
2
2
29
Top
Of
Unit
Foa
m
Ai
rS
eal To Support Rain Flashing
En
tir
e
Leng
th
Of
Top
Of
Cal
king
Along
W
all
St
ru
ctu
re
Seal
W
ith
Bead
Rain
Fla
shing
Supplied
TH
E
SI
DE
M
OU
NTI
NG
FL
AN
GE
S
AN
D
UNDE
R
TO
P FL
AS
HI
NG
AT TI
M
E
OF I
NS
TA
LL
ATI
ON
Suppl
yA
ir
Righ
tS
ide
View
Re
tu
rn
M
IS
-3898
Opening
Ai
r
NO
TES
:
IT I
S
RE
COM
M
ENDE
D T
HA
T
A
BEA
D
OF
SILI
CO
NE
CA
UL
KI
NG
BE
PL
ACE
D
BE
HI
ND
A
During Installation
Foam Seal
Foam Seal
Foam Seal
Foam Seal
Содержание MULTI-TEC W24AAPA
Страница 3: ...Page 3 of 88 SECTION 1 MULTI TEC LC6000 INSTALLATION INSTRUCTIONS...
Страница 36: ...Manual 2100 676B Page 36 of 88 FIGURE 25 LC6000 Wiring Diagram...
Страница 46: ...Manual 2100 676B Page 46 of 88...
Страница 47: ...Manual 2100 676B Page 47 of 88 SECTION 2 WR SERIES LC6000 INSTALLATION INSTRUCTIONS...
Страница 79: ...Manual 2100 676B Page 79 of 88 FIGURE 32 LC6000 Wiring Diagram...