Step 14
Attach three
M6 Wall Rails
to E5 Tower Leg using 5/16” x 1 ½” Bolts, Lock Washers,
Washers. Then level across and attach to E6 Tower Leg Using 5/16” x 2” Lag Screws and Lock Washers.
Attach two
M8 Wall Boards
against E6 and two against E5 using 1 1/8” Wood Screws.
Attach seven
M13 Wall Boards
between M8's with 1 1/8” Wood Screws.
Attach
M23 Window Trim Boards
to M8's with 1 1/8” Wood Screws.
Attach
M12 Window Trim
to M13's and M8's with 1 1/8” Wood Screws.
Attach Window
Mesh Panel
to inside of window opening with ¾” Washer Head Screws.
7/8” Barrel Nuts and Lock
M6
M6
M6
E5
E6
E6
E5
M8
M13
M23
M23
M12
ITEMS NEEDED
3-M6 Wall Rails
4-M8 Wall Boards
7-M13 Wall Boards
1-M12 Window Trim
2-M23 Window Trim
HARDWARE NEEDED
1-Mesh Panel
6-5/16” x 1 ½” Bolts
6-5/16” x 7/8” Barrel Nuts
3-5/16” x 2” Lag Screws
6-Lock Washers for Bolts
6-Lock Washers for Barrel Nuts
50-1 1/8” Wood Screws
6-3/4” Washer Head Screws
PAGE 36