Step 1
( Note Position of Pilot Holes in Tower Legs )
Attach
G2 Wall Rail
to
E1 Right Front Tower Leg
,
E2 Center Front
Tower Leg
and
E3 Left Front Tower Leg
using 5/16” x 2” Bolts, Lock Washers and 7/8” Barrel Nuts and Lock Washers.
Attach
G1 Base Board
to E1 Right Front Tower Leg using 5/16” x 2” Bolts, Lock Washers and 7/8” Barrel Nuts and
Lock Washers.
Attach G1 to E2 Center Front Tower Leg and
H10 Bottom Floor Support
with 5/16” x 2 ¾” Bolts, Lock Washers
and 7/8” Barrel Nuts and Lock Washers.
Finish Attaching G1 to E3 Left Front Tower Leg and H10 Bottom Floor Support using 5/16” x 2 ¾” Bolts, Lock
Washers and 7/8” Barrel Nuts and Lock Washers.
G2
G1
H10
H10
E3
E2
E1
ITEMS NEEDED
HARDWARE NEEDED
1-E1 Tower Leg
1-E2 Tower Leg
1-E3 Tower Leg
1-G2 Wall Rail
1-G1 Base Board
2-H10 Bottom Floor Support
4-5/16” x 2 ¾” Bolts
8-5/16” x 2” Bolts
12-5/16” x 7/8” Barrel Nuts
12- Lock Washers for Bolts
12- Lock Washers for Barrel Nuts
2 ¾”
2 ¾”
2”
2”
2”
2”
Pilot Holes
Pilot Holes
4 Pilot Holes
PAGE 23
7 Pilot Holes