Step 12
Attach two
G13 Sand Box Seats
to G9 and G4 Base Boards with 2 ½” Wood Screws.
Attach three
M5 Wall Rails
to E1and E5 Tower Legs with 5/16” x 2” Lag Screws and Lock Washers.
Attach one more M5 Wall Rail to E2 and E6 Tower Legs with
5/16” x 2” Hex Type Lag Screws
and Fender
Washers.
G13
G13
M5
M5
M5
ITEMS NEEDED
2-G13 Sand Box Seats
4-M5 Wall Rails
HARDWARE NEEDED
6-5/16” x 2” Lag Screws
6-Lock Washers for Bolts
8-2 ½” Wood Screws
2-5/16” x 2” Hex Type Lag Screws
2-Fender Washers
PAGE 34
E1
E5
E6
E2
Hex Head
Lag Screws