Step 15
Drive four 5/16” Spike T Nuts into G5 Wall Rail/ Swing Mount for later use. Now Attach two M8 Wall Boards against
E1 and two against E5 Tower Legs using 1 1/8” Wood Screws.
Attach a
L2 Wall Board
then a
N3 Wall Board
and another L2 with 1 1/8" Wood Screws. Now attach three more
M8's another L2, N3 and last L2 with 1 1/8” Wood Screws. Flush a
L3 Wall Board
and then
N5 Wall Board
and
another L3 with top of M8's and secure with 1 1/8” Wood Screws on both sides of window openings.
Attach
A100010 Windows Frames
to M8's using ¾” Washer Head Screws. Now attach
O1 Wall Supports
under
Window Frames and to Wall Boards using 1 1/8” Wood Screws.
G5
M8
M8
M8
L3
L3
N5
N5
N3
N3
L2
L2
O1
ITEMS NEEDED
7-M8 Wall Boards
4-L2 Wall Boards
2-N5 Wall Boards
2-N3 Wall Boards
4-L3 Wall Boards
2-O1 Wall Supports
HARDWARE NEEDED
4-5/16” Spike T Nuts
58-1 1/8” Wood Screws
8-3/4” Washer Head Screws
2-A100010 Window Frames
PAGE 37