Step 4
With help stand Tower assemblies up and attach
G6 Floor Rail
to E5 and E1 Tower Legs with 5/16” x 2” Lag Screws
and Lock Washers.
Attach
G5 Wall Rail/ Swing Mount
to top of E5 and E1 Tower Legs with 5/16” x 2” Lag Screws and Lock Washers.
Attach
G4 Base/Sand Box Board
to bottom of E5 and E1 with 5/16” x 2” Lag Screws and Lock Washers.
G5
G6
G4
E1
E5
ITEMS NEEDED
1-G6 Floor Rail
1-G5 Wall Rail/Swing Mount
1-G4 Base Brd/ Sand Box
HARDWARE NEEDED
12-5/16” x 2” Lag Screws
12- Lock Washers for Bolts
PAGE 26