Step 30
Stake set down using
Y41 stakes
at locations shown using ¼” x 1” Phillips Truss Head Bolts, Flat Washers and ¼”
Barrel Nuts.
Measure in 6” from each end of Swing Beam Ground Board and screw stake into ground until 3” from top of Ground
Board. (You can use a screwdriver for leverage if needed) Using hole in stake as guide drill through Ground Board
with 3/8” drill bit.
Attach I.D. Plate to Swing Beam using #8 x ¾” Wood Screws.
Attach Y10-16.5G Hand Grips to E1, E2 and E3 Tower Legs using 5/16” x 1-½” Bolts, Lock Washers and 5/16”
Spike-T-Nuts. Measure up 7” and 22” and center of M10 and drill through these locations with a 3/8” drill bit.
Attach Y10-16.5G to M10 using 5/16” x ½” Bolt, Lock Washer and 5/16” Spike-T-Nuts.
ITEMS NEEDED
1-I.D. Plate
2-Y41 Ground Stakes
4-Y10-16.5G Hand Grips
HARDWARE NEEDED
2- ¼” x 1” Phillips Truss Head Bolts
2-1/4” Barrel Nuts
4-Flat Washers
2-5/16” Lock Washers
4-#8x3/4” Wood Screws
2-5/16” x ½” Bolts
6-5/16” x 1 ½” Bolts
12-5/16” Spike T Nuts
12-Lock Washers for Bolts
Metal Stake
FLAT
WASHER
BOLT
LOCK
WASHER
BO
ARD
FLAT
WASHER
BARREL
NUT
5/16"
PAGE 52
1 ” Truss
Head Bolts
G50
6”
6”
ID
Plate
M10
7”
22”