Step 11
Attach
G9 Base Boards
to E1 and E2 on Front and to E5 and E6 on Back using 5/16” x 2” Bolts, Lock Washers and
7/8” Barrel Nuts and Lock Washers.
Attach G4 Base/Sand Box Board to E1 and E5 and E2 and E6 using 5/16” x 2” Lag Screws and Lock Washers.
Attach a L1 Outside Filler Floor Board between E3 and E7 Tower Legs with 1 ½” Wood Screws in the holes
indicated, and 2 ½” Wood Screws in remaining holes.
Attach five M3 one N1 and four more M3 Floor Boards with 2 ½” Wood Screws and finish floor by attaching a
SC1
Floor Board
between E2 and E6 Center Tower Legs with 1 ½” Wood Screws.
L1
M3
M3
N1
SC1
G9
G9
G4
G4
E5
E6
E1
E2
E2
E6
E7
E3
ITEMS NEEDED
2-G9 Base Boards
2-G4 Base/Sand Box Boards
1-L1 Outside Filler Floor Boards
1-N1 Floor Board
1-SC1 Floor Board
9-M3 Floor Boards
HARDWARE NEEDED
8-5/16” x 2” Bolts
8-5/16” x 2” Lag Screws
8-5/16” x 7/8” Barrel nuts
8-Lock Washers for Barrel Nuts
16- Lock Washers for Bolts
4-1 ½” Wood Screws
74-2 ½” Wood Screws
PAGE 33
1 1/2”
1 1/2”