Step 9
Attach G7 Floor Rail to E6 and E2 Tower Legs on upper floor between E3 and E7 with 5/16” x 2” Lag Screws and
Lock Washers.
Attach
H9 Floor Joist
to G6 and G7 Floor Rails on upper Floor using 2 1/2” Wood Screws.
Now attach a L1 Outside Filler Floor Board between Tower Legs with 1 ½” Wood Screws, in the holes indicated,
and 2 ½” Wood Screws in remaining holes . .
Evenly space five M3 Floor Boards and one
N1 Floor Board
and four more M3 Floor Boards and secure using 2 ½”
Wood Screws.
H9
H9
G7
G6
L1
N1
M3
M3
ITEMS NEEDED
1-G7 Floor Rail
2-H9 Floor Joists
1-L1 Outside Filler Floor Board
9-M3 Floor Boards
1-N1Floor Board
HARDWARE NEEDED
4-5/16” x 2” Lag Screws
4-Lock Washers for Bolts
4-1 ½” Wood Screws
68-2 ½” Wood Screws
PAGE 31
E6
E7
E2
E3
E7
E3
1 1/2”
1 1/2”