Step 16
Attach G8 Wall Rail to top of E2 and E6 Tower Legs using 5/16” x 2” Lag Screws and Lock Washers.
Attach three
M9 Wall Boards
to G8 and G7 on each side of opening and flush with bottom of floor rail G7 with 1 1/8”
Wood Screws.
Attach five
M14 Wall Boards
to back wall rails 1 ¼” up from floor and with a 2 ¾” space using 1 1/8” Wood Screws.
Attach two more M14 to each side of opening on left side of set to G8 and M21 - 1 ¼” up from floor and with a 1 7/8”
space using 1 1/8” Wood Screws.
G8
E6
E2
G8
M9
M9
M14
M14
M14
ITEMS NEEDED
1-G8 Wall Rail
6-M9 Wall Boards
9-M14 Wall Boards
HARDWARE NEEDED
4-5/16” x 2” Lag Screws
4-Lock Washers for Bolts
60-1 1/8” Wood Screws
PAGE 38
2-3/4”
1-1/4”
1-7/8”
G8
M21