209
9.5 F
EED
UNIT
ALS
20X
256
Installing motor, toothed belt and belt
pulley
Smooth dents in the shafts [277arrow] with an oils-
tone as necessary.
Loosely pre-mount the motor [278E], do not yet fully
tighten the 3 screws on the motor mount.
Unscrew setscrews from belt pulley [278A]. Clean
threads and screw setscrews back in with
Loctite 243 Threadlock. Install the motor pinion, too-
thed belt and belt pulley before the threadlock har-
dens. Follow the threadlock manufacturer's
instructions for use.
Installing toothed belt and pulley
Place the toothed belt [278D] over the motor
pinion [278C]. Slide belt pulley [278A] into place and
pull belt onto belt pulley.
Turn the belt pulley in order to align one of the two
setscrews [278B] with the bevel in the motor shaft
[278arrow].
Aligning belt pulley and toothed belt with motor pini-
on: The toothed belt must run in the centre of the
belt pulley and motor pinion.
– (ALS 256) The belt pulley is positioned further out-
side on the shaft (approx. 1.5 mm behind the shaft
end).
Tighten setscrew to bevel, then tighten second
setscrew.
Adjusting toothed belt tension:
Slide the motor [278E] until the toothed belt is taut.
Tighten 3 screws on the motor mount.
Connect and install the motor driver board [279B].
Fasten motor lead to housing with cable
fastening [279A].
Install casing rear wall.
[277] Dent in the feed roller shaft
[278] Pre-mounting motor loosely (position of the belt pulley as in
[279] Installing belt and pulley, installing PCB, securing cable
Содержание ALS 204
Страница 1: ...ALS 204 206 256 SERVICE INSTALLATION MANUAL Labeller Edition 8 3 2012 Original version ...
Страница 2: ......
Страница 125: ...125 7 ELECTRONICS DESCRIPTION 7 3 CIRCUIT BOARDS ALS 20X 256 Layout diagram 125 Layout diagram for the CPU board ...
Страница 128: ...128 7 ELECTRONICS DESCRIPTION 7 3 CIRCUIT BOARDS ALS 20X 256 Layout diagram 129 Layout diagram for motor driver board ...
Страница 223: ......