SECTION 5 – INSTALLATION
PAGE 5-18 REV. 0 2014-APR-30
CHECKFIRE 110
Detection and Actuation System
FINAL CONNECTIONS
Electric actuation: Refer to Section 6 – Test and Place in
Service for final electric actuation connections.
Combined electric and pneumatic actuation: Connect both
pneumatic actuator hose(s) and Release Circuit Drop Cable(s)
with installed PAD(s) (electric actuation instructions in Section
6 – Test and Place in Service).
PNEUMATIC MANUAL ACTUATION (Optional)
If layout drawing includes an optional pneumatic manual actu-
ator in the operator’s compartment, confirm the operator has
access to the red strike button on the actuator. For detailed
installation guidelines, refer to the appropriate system manual
(latest edition).
LT-A-101-10/20/30 Manual
(Part No. 24327)
LT-A-101-50/125/250 Manual (Part No. 427865)
LVS Manual
(Part No. 427109)
Содержание CHECKFIRE 110
Страница 2: ......
Страница 6: ...REVISION RECORD PAGE 2 REV 0 2014 MAY 01 NOTES CHECKFIRE 110 Detection and Actuation System ...
Страница 22: ...SECTION 3 USER INTERFACE PAGE 3 4 REV 0 2014 APR 30 NOTES CHECKFIRE 110 Detection and Actuation System ...
Страница 68: ...SECTION 7 IN CASE OF FIRE PAGE 7 2 REV 0 2014 APR 30 NOTES CHECKFIRE 110 Detection and Actuation System ...
Страница 84: ...SECTION 9 TROUBLESHOOTING PAGE 9 10 REV 0 2014 APR 30 NOTES CHECKFIRE 110 Detection and Actuation System ...