![Ansul CHECKFIRE 110 Скачать руководство пользователя страница 64](http://html1.mh-extra.com/html/ansul/checkfire-110/checkfire-110_planning-installation-operation-and-maintenance-manual_2946332064.webp)
SECTION 6 – TEST AND PLACE IN SERVICE
PAGE 6-16 REV. 0 2014-APR-30
CHECKFIRE 110
Detection and Actuation System
TABLE 6-7: PLACING CHECKFIRE 110 CONTROL mODULE IN SERVICE
1. Reconnect external power circuit. The Power LED returns
to GREEN steady-on. (At completion of testing return all
devices to normal status.)
2. Confirm all EMAs are in the up / ring-pinned positions
and properly re-sealed with a visual seal.
3. Close guard door for “PuSH To Activate / Alarm When
Lit” button and install visual seal.
4. Replace DCT with Detection EOL Device in the detection
circuit. Detection fault indication starts and then clears.
5. Remove RCT and/or Release Circuit Test Plug from
Release Circuit Drop Cable. Note: Release fault indica-
tion starts and remains in fault until installation of PAD(s).
Continues Next Page
009239
REMOVE RCT AND
RELEASE CIRCuIT
TEST PLuG
009153
ALL EMAs IN uP/PINNED
POSITION AND SEALED
009180
RECONNECT ExTERNAL
POWER, LED IS GREEN
STEADY-ON
009161
REPLACE DCT WITH EOL
DEVICE IN DETECTION
CIRCuIT
009151
SEAL GuARD
DOOR
PROTECTING
RED BuTTON
Содержание CHECKFIRE 110
Страница 2: ......
Страница 6: ...REVISION RECORD PAGE 2 REV 0 2014 MAY 01 NOTES CHECKFIRE 110 Detection and Actuation System ...
Страница 22: ...SECTION 3 USER INTERFACE PAGE 3 4 REV 0 2014 APR 30 NOTES CHECKFIRE 110 Detection and Actuation System ...
Страница 68: ...SECTION 7 IN CASE OF FIRE PAGE 7 2 REV 0 2014 APR 30 NOTES CHECKFIRE 110 Detection and Actuation System ...
Страница 84: ...SECTION 9 TROUBLESHOOTING PAGE 9 10 REV 0 2014 APR 30 NOTES CHECKFIRE 110 Detection and Actuation System ...