![Ansul CHECKFIRE 110 Скачать руководство пользователя страница 44](http://html1.mh-extra.com/html/ansul/checkfire-110/checkfire-110_planning-installation-operation-and-maintenance-manual_2946332044.webp)
SECTION 5 – INSTALLATION
PAGE 5-14 REV. 0 2014-APR-30
CHECKFIRE 110
Detection and Actuation System
POWER CIRCUIT CABLES
The Power Circuit Cable Lead (Green connector) on the
CHECKFIRE 110 Control Module is the starting point of the
power circuit. See Figure 5-43.
FIGURE 5-43
CHECKFIRE 110 CABLES
009150
The power circuit consists of Power Circuit Cable(s) and Fused
Power Circuit Cable. See Figure 5-44.
FIGURE 5-44
POWER CIRCUIT
009227
Before installation remove fuse and place in a safe place.
Install power circuit using the following rules:
1. It is recommended to install power circuit directly to the
12/24 VDC nominal vehicle battery(s), if possible. This will
provide continuous power for 24 hour system protection.
2. Install 1/2 in. (13 mm) ring terminal on black jacketed cable,
labeled “– VEH BATT” to the negative post on battery or
12/24 VDC nominal power source.
3. Install 1/2 in. (13 mm) ring terminal on red jacketed, 3A
fused cable, labeled “+ VEH BATT” to the positive post on
the battery or 12/24 VDC nominal power source. Do not
install fuse at this time.
4. Route and secure the Power Circuit Cable following the
installation instructions under Cable Connectivity / Installa-
tion, page 5-4.
5. Do not install fuse until entire system is ready for testing
(refer to Section 6 – Test and Place in Service). when
ready, install fuse following required steps (a – e) to ensure
an IP67 connection. See Figure 5-45.
a. Insert new fuse.
b. Apply entire contents of supplied Dow Corning 4 (dielec-
tric grease) inside inline fuse holder cover.
c. Snap cover in place and press firmly together around
outer edges to properly seal.
d. wipe off excess grease on outside of inline fuse holder.
e. May take up to a minute before green Power LED
displays on the control module.
FIGURE 5-45
FUSE INSTALLATION
009228
NOTICE
Anytime fuse cover is opened or fuse is
removed, review steps (a-e) to confirm
fuse and cover is correctly replaced.
Cover must be completely refilled with
Dow Corning #4 or equal (dielectric)
grease before closing to maintain IP67
rating. Press cover firmly in place and
wipe off excess grease.
POwER
CIRCUIT LEAD
NOTE: CABLES
SHOwN SHORTER
THAN ACTUAL LENGTH
INSERT NEw FUSE
FILL COVER wITH
DOw CORNING 4
GREASE
FIRMLY PRESS COVER
IN PLACE AND wIPE
OFF EXCESS GREASE
INLINE
FUSE
HOLDER
RED TO
POSITIVE (+)
BATTERY POST
POwER CIRCUIT
CABLE
BLACK TO NEGATIVE
(–) BATTERY POST
FUSED POwER
CIRCUIT CABLE
Содержание CHECKFIRE 110
Страница 2: ......
Страница 6: ...REVISION RECORD PAGE 2 REV 0 2014 MAY 01 NOTES CHECKFIRE 110 Detection and Actuation System ...
Страница 22: ...SECTION 3 USER INTERFACE PAGE 3 4 REV 0 2014 APR 30 NOTES CHECKFIRE 110 Detection and Actuation System ...
Страница 68: ...SECTION 7 IN CASE OF FIRE PAGE 7 2 REV 0 2014 APR 30 NOTES CHECKFIRE 110 Detection and Actuation System ...
Страница 84: ...SECTION 9 TROUBLESHOOTING PAGE 9 10 REV 0 2014 APR 30 NOTES CHECKFIRE 110 Detection and Actuation System ...