![Ansul CHECKFIRE 110 Скачать руководство пользователя страница 66](http://html1.mh-extra.com/html/ansul/checkfire-110/checkfire-110_planning-installation-operation-and-maintenance-manual_2946332066.webp)
SECTION 6 – TEST AND PLACE IN SERVICE
PAGE 6-18 REV. 0 2014-APR-30
CHECKFIRE 110
Detection and Actuation System
TABLE 6-7: PLACING CHECKFIRE 110 CONTROL mODULE IN SERVICE (Continued)
9. If needed complete installation of optional pneumatic
manual actuator(s). Refer to Section 5 – Installation.
10. Re-install pneumatic manual actuator cartridge(s) if previ-
ously removed.
11. Reset control module to Normal: Press and hold the
“DELAY/Reset/Silence” button for 3 seconds; Power LED
and Sounder quickly pulse 3 or 5 times, then Power LED
remains GREEN steady-on.
12. Record results of testing.
009171
ELECTRONIC ACTuATION
INSTALLATION COMPLETE
IF REMOVED, RE-INSTALL
MANuAL ACTuATOR
CARTRIDGE(S)
009151
RESET TO
NORmAL
PRESS AND
HOLD
3 SECONDS
POWER LED
IS GREEN
STEADY-ON
Содержание CHECKFIRE 110
Страница 2: ......
Страница 6: ...REVISION RECORD PAGE 2 REV 0 2014 MAY 01 NOTES CHECKFIRE 110 Detection and Actuation System ...
Страница 22: ...SECTION 3 USER INTERFACE PAGE 3 4 REV 0 2014 APR 30 NOTES CHECKFIRE 110 Detection and Actuation System ...
Страница 68: ...SECTION 7 IN CASE OF FIRE PAGE 7 2 REV 0 2014 APR 30 NOTES CHECKFIRE 110 Detection and Actuation System ...
Страница 84: ...SECTION 9 TROUBLESHOOTING PAGE 9 10 REV 0 2014 APR 30 NOTES CHECKFIRE 110 Detection and Actuation System ...