SECTION 6 – TEST AND PLACE IN SERVICE
PAGE 6-8 REV. 0 2014-APR-30
CHECKFIRE 110
Detection and Actuation System
TABLE 6-4: OPERATIONAL TEST (Continued)
Internal Power Circuit – Supervision Test
Disconnect the external power circuit connection at the
CHECKFIRE 110 Power Circuit Lead.
1. Power LED pulses AMBER 1 x 30 seconds.
2. Sounder pulses 1 x 30 seconds for 10 minutes then
auto-silences to conserve energy.
3. Repeat supervision tests on internal power:
• Detection circuit – Supervision test (page 6-6)
• Release circuit – Supervision test (page 6-7)
4. Reconnect external power circuit connection at the
Power Circuit Lead. The CHECKFIRE 110 Control
Module returns to Normal status; Power LED is GREEN
steady-on. (may take up to 10 seconds)
Verify Time Delay
Reset control module to Normal: Press and hold the “DELAY/
Reset/Silence” button for 3 seconds; Power LED and
Sounder quickly pulse 3 or 5 times, then Power LED remains
GREEN steady-on.
The number of pulses at end of reset indicates length of time
delay.
3 Pulses – 5 Second time Delay
5 Pulses – 15 Second time Delay
009180
REPEAT ABOVE
TESTS ON INTERNAL
POWER
RECONNECT
ExTERNAL POWER
AND MODuLE
RETuRNS TO
NORMAL STATuS
POWER LED IS
GREEN STEADY-ON
009180b
VERIFY TImE
DELAY SETTING
PRESS AND
HOLD 3 SECONDS
POWER LED
IS GREEN
STEADY-ON
TIME DELAY
SETTING INDICATION:
LED AND
TIME
SOuNDER DELAY
PuLSE
SECONDS
3
5
5
15
009180c
POwER SUPERVISION
(REmOVE POwER
CABLE)
AMBER LED AND
SOuNDER PuLSE
1 x 30 SECONDS
AFTER 10 mINUTES
SOuNDER
AuTO-SILENCES
Содержание CHECKFIRE 110
Страница 2: ......
Страница 6: ...REVISION RECORD PAGE 2 REV 0 2014 MAY 01 NOTES CHECKFIRE 110 Detection and Actuation System ...
Страница 22: ...SECTION 3 USER INTERFACE PAGE 3 4 REV 0 2014 APR 30 NOTES CHECKFIRE 110 Detection and Actuation System ...
Страница 68: ...SECTION 7 IN CASE OF FIRE PAGE 7 2 REV 0 2014 APR 30 NOTES CHECKFIRE 110 Detection and Actuation System ...
Страница 84: ...SECTION 9 TROUBLESHOOTING PAGE 9 10 REV 0 2014 APR 30 NOTES CHECKFIRE 110 Detection and Actuation System ...